My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2022-1825
PORTAL
>
CITY COUNCIL RECORDS
>
ORDINANCES (45.120)
>
2022 Ordinances
>
Ordinance 2022-1825
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2022 10:36:23 AM
Creation date
5/2/2022 10:28:47 AM
Metadata
Fields
Template:
City Council Records
Also Known As (aka)
Marshall Fire__Adopting by Reference the 2018 IECC Alternative for Rebuilding Structures Significantly Damanged or Destroyed by the Marshall Fire
Meeting Date
4/5/2022
Doc Type
Ordinance
Signed Date
4/5/2022
Ord/Res - Year
2022
Ord/Res - Number
1825
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Commercial heated structures shall meet the following natural <br />lighting standards: <br />l . Three percent of roof shall be skylights, unless used for solar panels; <br />2. Not less than eight percent of floor area shall be glazed. <br />Sec. 15.60.070. Air changes. <br />All new heated residential structures shall be designed and constructed with <br />whole house mechanical ventilation in accordance with section M1505.4 ofthe 2018 <br />International Residential Code, and shall be tested to verify air leakage rate does not <br />exceed three air changes in one hour. <br />Sec. 1.5.60.080. Design criteria. <br />All new heated commercial and residential heated structures shall meet the <br />following design criteria: <br />1. Snow load: 30 pounds per square foot. <br />2. Wind speed: <br />a. 145 miles per hour three second gust ASCE-7-10; <br />b. ASTM D3161 test with Class F Application. <br />3. Wind exposure: "C", unless in the opinion of the Chief Building <br />Official greater restrictions are needed to protect public safety. <br />4. Seismic zone: B. <br />5. Frost line depth: 36 inches below finished grade. <br />6. Weathering: Severe — Climate Zone 5B. <br />7. Termite: Slight. <br />8. Decay: Slight. <br />9. Winter design temperature: one degree. <br />10. Anticipated snow: six inches. <br />Ordinance No. 1825, Series 2022 <br />Page 9 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.