Laserfiche WebLink
The meter Fnnd revenues of $24,875 consist of fees derived form the sale of cemetery plots <br />and are restricted for perpetual care of the cemetery. The Cemetery Funds also will have a <br />beginning fund balance of $231,489 in 1995. Based on the total revenues and the fund balance <br />for 1995, interest earnings anticipated in this fund are $9,875 and will be transferred to the <br />General Fund to offset operational costs of maintaining the cemetery. <br />The major source of revenue for the Combined Capital improvement Fund is revenue from the <br />service expansion fee and major thoroughfare fee which are collected during the building permit <br />process. These fees are restricted for the construction of buildings and park facilities; <br />improvements to street, sidewalks, and trails; the acquisition of trees; improvements to drainage <br />systems; and the purchase of capital equipment. The 1995 funding level for capital improvements <br />projects is $2,730,100, which represents a decrease of 38.2 percent over 1994 level of <br />$4,417,820. The major projects to be funded from the Combined Capital Improvements Fund are <br />as follows: <br />• Approximately $1,275,000 is allocated in 1995 for construction of a multi -field <br />sports complex on the Harney-Lastoka open space property the City purchased in <br />the Spring of 1993. <br />• Design and construction of the new "Park at the Meadows" in 1995 at <br />$260,000. <br />• Renovation of the Louisville Center for the Arts in 1995 at $80,000. <br />• Continued support and assistance for completion of the Coal Creek/Rock Creek <br />Trail Project at $50,000. <br />• Installation of new traffic signals at approximately $304,000 in 1995. <br />• Upgrade to the Railroad crossing on Pine Street for $166,000 in 1995 <br />• Approximately $69,000 has been allocated for storm drainage improvements during <br />1995. <br />• Approximately $105,000 is dedicated in 1995 for phase I of the proposed City Hall <br />Expansion project. Phase I consists of a comprehensive space utilization and needs <br />analysis for expansion and if necessary development of appropriate design <br />documents and other pre -construction materials. Construction, if necessary, would <br />likely occur in 1996. <br />• New computer equipment and upgrades to existing systems will be provided in <br />1995 at $35,000. <br />vi <br />