My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998 BUDGET
PORTAL
>
BUDGET and ACFR__ANNUAL COMPREHENSIVE FINANCIAL RPTS (30.080 & 30.040A)
>
BUDGETS
>
1973-1999 Budgets
>
1998 BUDGET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2022 1:04:02 PM
Creation date
9/20/2022 3:16:57 PM
Metadata
Fields
Template:
CITYWIDE
Doc Type
Budget City
Ord/Res - Year
1997
Ord/Res - Number
51
52
Record Series Code
30.080
Record Series Name
Budget Records
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a four-year period. The budget reflects the continuous investment in the City work force <br />with a 2.5 percent market adjustment, a 4 percent pro -rated merit increase, and 10 percent <br />increase to the self-insurance contribution. This is a total increase in personal services by <br />4.1 percent. <br />As a result of applying growth factors to each department, a funding base was established <br />to maintain the current level of service, with the Council approving additional programs in <br />excess of this benchmark. <br />In 1997, the growth of sales tax revenue allowed for the transfer of $500,000 from the <br />general fund to the capital projects fund. The 1998 level has risen to $650,000. This has <br />been accomplished in addition to maintaining a fund balance level well beyond the <br />prescribed minimum. <br />Current Year Goals/Policies <br />A. An ongoing multi -year plan for landscape and beautification is being accomplished <br />through landscape improvements budgeted at $300,000 and gateway <br />improvements of $125,000. <br />B. Restricted revenue from the residential use tax of $508,601 has been fully <br />appropriated in 1998 to be spent once the projects have been determined in <br />keeping with Council goals. <br />C. Continuing revitalization of downtown has been budgeted in two phases in 1998 at <br />a total cost of $413,900, to include the 600 block of Main Street. <br />D. Trails and trail connections are important aspects of Council goals. These have <br />been addressed through $100,000 for new trails and $120,000 for trail <br />improvements. <br />E. The street improvements budget has increased by $200,000 to $1,300,000 in <br />response to Council goals. <br />F Design and sidewalk construction along Cherry Street was specified by the Council. <br />This is budgeted at $89,000 in 1998 with construction of Cherry Street budgeted at <br />$542,000 in 1999. <br />G. To meet Council goals, the McCaslin intersection improvements and traffic signal <br />interconnect are budgeted at $35,000 and $25,000 respectively. <br />H The goal to begin planning for construction of a pedestrian underpass at the <br />recreation center has been budgeted at $40,000 with $420,000 budgeted in 1999 <br />for construction. <br />Drainageway A is budgeted at $137,500 for completion, per Council goals. <br />
The URL can be used to link to this page
Your browser does not support the video tag.