My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board of Adjustment Agenda and Packet 2022 09 21
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
BOARD OF ADJUSTMENT
>
2022 Board of Adjustment Agendas and Packets
>
Board of Adjustment Agenda and Packet 2022 09 21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2022 5:02:17 PM
Creation date
9/20/2022 4:30:52 PM
Metadata
Fields
Template:
City Council Records
Meeting Date
9/21/2022
Doc Type
Boards Commissions Committees Records
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
T.O. <br />UPPE <br />Q T.O. <br />MAIr <br />I MNSUNKT KLIUKN <br />ELEVATION A <br />LEFT SIDE ELEVATION <br />ANDBEAM <br />ROOF PER BUILDER <br />ACCENT 51DIN& <br />IX4 FRIEZE TRIM <br />FA501A BOARD <br />� ■do <br />I� LEI <br />WINN <br />AM <br />- <br />ADHERED CONCRETE <br />CAP <br />_ ADHERED CONCRETE <br />I milli/ <br />Neill oil <br />j_i I gyp! <br />ELEVATION A <br />FRONT ELEVATION <br />JV�\YL• I/T - I V <br />6" CORNER TRIM, <br />TYP. <br />TYP. WINDOW TRIM, <br />RE: DETAIL <br />LAP SIDING W/ 5" <br />EXPOSURE <br />s <br />RAILING AS REO'D <br />- BY CODE - - <br />ELEVATION NOTES: <br />I. TYPICAL ROOF - COMPOSITION <br />SHINGLE ROOFING MATERIAL ON <br />7/I6" ROOF 5HEATHIN6 ON <br />PRE-FAB. ROOF TRUSSES <br />2. TYPICAL SIDING - LAP SIDING <br />PER ELEVATIONS OVER <br />WEATHER BARRIER OVER 7/I6'' <br />O.S.B. SHEATHING, 5EE <br />ELEVATIONS FOR EXPOSURE. <br />5. TYPICAL ACCENT SIDING - <br />"5HAKE" STYLE 5H I N6LE 51 D 1 N6 <br />OR BOARD AND BATTEN S I D I N6 <br />PER ELEVATIONS OVER <br />WEATHER BARRIER OVER 7/I6" <br />O.S.B. SHEATHING <br />4. TYPICAL STONE VENEER - <br />5YNTHETIC STONE VENEER PER <br />ELEVATIONS, INSTALL PER <br />MANUF. SPECS., OVER WEATHER <br />BARRIER OVER 7/I6" 0.5.5. <br />5HEATHIN6 <br />5. TYPICAL BRICK VENEER - <br />BRICK VENEER PER ELEVATIONS <br />INSTALL PER CODE, OVER <br />WEATHER BARRIER OVER 7/16" <br />O.S.B. SHEATHING <br />6. G.I. FLASHING. AT ALL ROOF TO <br />WALL LOCATIONS, SADDLE AND <br />CRICKET LOCATIONS, AND <br />WINDOW AND DOOR HEAD <br />OPENINGS - TYP. <br />OWNERSHIP OF DOGUMENT5 AND DE516N5: <br />ALL ARCHITECTURAL DOGUMENT5 AND 0E516N5 DEVELOPED BY <br />05MO515 ARCHITECTURE, INC. REMAIN 05MO515 ARCHITECTURE, <br />ING. PROPERTY AND ARE TO BE USED ON TH15 PROJECT ONLY <br />UNDER THE TERM5 OF TH15 LETTER OF AGREEMENT. THE CLIENT <br />SHALL NOT, WITHOUT PRIOR WRITTEN APPROVAL OF 05MO515 <br />ARCHITECTURE, INC., U5E THE DOGUMENT5 OR 0E516N5 PROVIDED <br />UNDER THIS LETTER OF AGREEMENT ON OTHER PROJECTS OR <br />A5516N, 5EL, OR TRANSFER THE 5AME TO OTHER5. <br />DUTY OF COOPERATION: <br />RELEASE OF THE5E DOGUMENT5 ANTIGIPATE5 FURTHER <br />COOPERATION BETNEEN THE OWNER, THE CONTRACTOR AND THE <br />ARCHITECT. ALTHOUGH THE ARCHITECT AND H15 GON5ULTANT5 <br />HAVE PERFORMED THEIR 5ERVICE5 AITH DUE CARE AND <br />DILIGENCE, THEY CANNOT GUARANTEE PERFECTION. ANY <br />AMBIGUITY OR 015CRE°ANCY 015XVERED SHALL BE REPORTED <br />IMMEDIATELY TO THE ARCHITECT. FAILURE TO COOPERATE BY A <br />51MPLE NOTICE TO THE ARCHITECT SHALL RELIEVE THE <br />ARCHITECT FROM RE5PON51BILITY OF ALL G05EQUENGE5. <br />GHANGES MADE FROM THE PLANS WITHOUT THE CONSENT OF THE <br />ARCHITECT ARE UNAUTHORIZED AND SHALL RELIEVE THE <br />ARCHITECT OF RE5PON51BILITY FOR ALL GON5EQUENCE5 <br />ARRIVING OUT OF SUCH GHAN95. <br />� 4 <br />co ANNE E. O <br />,� POSTLE <br />r RC_3o 93r; <br />FL) <br />Vl <br />W � <br />I --I O <br />TZ <br />M W ry <br />(f) m <br />00 <br />N z z <br />z z w <br />z� <br />Q ~ U <br />J � oC <br />W w <br />m in <br />D <br />W 0 <br />°° <br />BOULDER CREEK co <br />�r-�rr innal-IncHis- <br />© boulder creek neighborhoods 2022 <br />© osmosis architecture 2022 <br />N <br />N <br />� <br />O <br />U <br />(D <br />O <br />— N <br />0 N <br />U ko E <br />F- M O <br />�0c: <br />ct <br />Cz <br />zaa <br />C: <br />�� <br />X0 'j <br />O <br />m N <br />iN <br />O� o <br />Cz <br />a M <br />- o 3 <br />Lu <br />w <br />Q <br />00 <br />z= <br />Oa <br />U <br />Lu <br />U) <br />O <br />M <br />N <br />OR16INAL ISSUE: DATE: <br />PERMIT 09 06 22 <br />aROTNEV1510N 15E: DATE: <br />PERMIT 09 06 22 <br />NO: <br />REV15ION TITLE: <br />DATE: <br />I <br />BUILDER REDLINES <br />02/02/22 <br />JOB #: <br />22004 <br />DRAWN: <br />JRN <br />GHEGKED: <br />AEP <br />A-4o0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.