My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Minutes 1980 12 02
PORTAL
>
CITY COUNCIL RECORDS
>
MINUTES (45.090)
>
1970-1999 City Council Minutes
>
1980 City Council Minutes
>
City Council Minutes 1980 12 02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 2:31:17 PM
Creation date
7/27/2009 9:00:11 AM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Minutes
Signed Date
12/2/1980
Original Hardcopy Storage
7C3
Supplemental fields
Test
CCMIN 1980 12 02
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Show annotations
View images
View plain text
<br />. <br /> <br />COUNCILMAN CUMMINGS <br />ALLEY VACATION <br /> <br />STOP SIGN AT WALNUT & SOUTH <br /> <br />COUNCILMAN DEL PIZZO <br />REGAL SQUARE <br /> <br />Page - 3 - <br /> <br />12/2/80 <br /> <br />ditch running through the Caranci <br />property they saw no problem with <br />covering the ditch. Director Rupp also <br />reported this was the responsibility <br />of the developer (Vic Caranci) and <br />he hadn't heard from him. <br /> <br />Inquired of Administrator Wurl what <br />the procedure was for vacating an <br />alley. Administrator Wurl advised <br />the first step would be a letter <br />from the person desiring the vacation <br />of the alley. Secondly that they <br />have the concurrence of all the people <br />adjacent to the alley. The staff <br />then reviews the letter and decides <br />whether the City needs an easement <br />through the alley for existing util- <br />ities. Then we submit a recommenda- <br />tion to the Planning Commission either <br />with or without retainage of an ease- <br />ment for utilities, then the City <br />Attorney prepares an ordinance for <br />Council's approval. <br /> <br />Requested that a stop sign be placed <br />at Walnut and South Sts. <br />Administrator Wurl reported he would <br />check with City Engineer Blanchard <br />to review the situation. <br /> <br />Had received phone calls from Regal <br />Square and requested that perhaps <br />some of the other Council members <br />look at the south wall of apartments <br />if 29 and 30, where the brick work is <br />breaking away. <br />Director Rupp reported that FmHA called <br />a meeting and met with the city staff <br />and Housing Authority. Along with staff <br />were. the contractor, the architect <br />and FmHA representative. After the <br />meeting Director Rupp asked what action <br />could be taken against the contractor <br />at this time. They requested that another <br />structural engineer review the project <br />and give us a report on the problems. <br />He will then pass this information on <br />to Council. Director Rupp also stated <br />that one of the residents was very belig- <br />erant and refused to let them in to <br />correct the problems. <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).