Laserfiche WebLink
year seven and after, with URAs having the remaining 50% to fulfill <br />their missions. This is similar in structure, but with a larger non- <br />URA share split, to the Tri-party Agreement between the LRC, <br />Louisville, and Boulder County. <br />VII. <br />Business Matters of Commission <br />1) Resolution No. 3, Series 2009 - Change of Location for Regularly <br />Scheduled LRC Meetings to Louisville Public Library, 951 Spruce <br />Street - Resolution No. 3, Series 2009 was approved unanimously. <br />2) Discussion/Direction/Action - Recommendation to City Council on <br />Preferred Option for Louisville FasTracks Rail Station Design <br />Staff presented the options outlined in the March 10, 2009 Memo: <br />Louisville Station Design Options. The options presented were to <br />determine the scope of the environmental clearance that RTD would <br />need to compete for the parking needs of the FasTracks Rail Station. <br />Each option’s Pro/Cons were discussed at length and dissected to <br />enhance the quality of the LRC’s preferred Option recommendation to <br />City Council. Characteristics discussed included parking space needs <br />and numbers, distance from the station, cost factors, use of existing <br />parking at the ball fields via an overpass or underpass, the potential <br />parking impacts west of the station, and how each option changes the <br />“sense of place” and makes a very different statement of who we are <br />as a community. <br />After lengthy discussion, a motion was made to recommend Option 2a <br />to the City Council. The motion was approved by all members present. <br />3) Discussion/Direction/Action Draft RFP for Design of <br />Underpass/Overpass at Rail Station <br />The LRC discussed the draft RFP for an Underpass/Overpass at the <br />Rail Station and asked staff to expand the scope of the RFP to be <br />called the Short Street Corridor from Main Street to the ball fields, <br />including consideration of an underpass at the Station and an <br />underpass/overpass/at grade crossing at Highway 42. Staff was also <br />asked to revise the draft to make it a request for qualifications rather <br />than an RFP, to strike references construction/engineering drawings, <br />and make other revisions. <br />4) Next Meeting Items – Short Street Corridor RFQ <br />5) Next Meeting Date – April 13, 2009 @ 7:30 AM, Louisville Public <br />st <br />Library 1 <br /> Floor Conference Room <br />VIII. Development Referrals - None <br />IX. Commissioners’ Comments - None <br />X. Adjourned at 9:15 AM <br /> <br />