Laserfiche WebLink
Ei'lville <br />�F <br />L s <br />COLORADO • SINCE 1878 <br />Department of Planning and Building Safety <br />749 Main Street • Louisville CO 80027 # 303.335.4592 # www.LouisvilleCO.aov <br />Building Type <br />PV System <br />PV System SF <br />Estimated <br />Size (kW) <br />First Cost <br />Multifamily Building (3 <br />stories, 42,000 SF) <br />98 kW <br />9,800 SF <br />$245,000 <br />Office Building (3 <br />stories, 110,000 SF) <br />250 kW <br />25,000 SF <br />$625,000 <br />Retail Building (1 story, <br />90,000 SF) <br />600 kW <br />60,000 SF <br />$1,500,0 <br />Option 3. PV Required to Offset Natural Gas Consumption On -Site <br />Building Type <br />PV that can <br />PV System <br />PV System <br />Estimated <br />fit on the <br />Size (kW) <br />SF <br />First Cost <br />Roof (kW) <br />Average Mixed - <br />Fuel <br />Multifamily <br />98 kW <br />176 kW <br />17,600 SF <br />$440,000 <br />Building <br />Average Mixed - <br />Fuel office <br />250 kW <br />153 kW <br />15,300 SF <br />$382,500 <br />Building <br />Average Mixed - <br />Fuel Retail <br />600 kW <br />608 kW <br />60,800 SF <br />$1,S20,000 <br />Building <br />Policy Consideration [2] <br />• Require projects to meet a maximum -allowed energy use per square foot <br />(EUI) for the performance pathway and require additional efficiency <br />measures for the prescriptive path. Onsite PV can contribute to EUI target. <br />• Require a solar -ready zone, electric -ready construction, and EV-readiness. <br />