My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Building Code Board of Appeals Agenda and Packet 2022 10 20
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
BUILDING CODE BOARD OF APPEALS
>
2022 Building Code Board of Appeals Agendas and Packets
>
Building Code Board of Appeals Agenda and Packet 2022 10 20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2022 4:52:06 PM
Creation date
10/27/2022 1:27:51 PM
Metadata
Fields
Template:
City Council Records
Meeting Date
10/18/2022
Doc Type
Boards Commissions Committees Records
Text box
ID:
1
Creator:
Created:
10/27/2022 1:28 PM
Modified:
10/27/2022 1:28 PM
Text:
http://www.louisvilleco.gov/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WLilou�suyi l ��11e Department of Planning and Building Safety <br />L <br />COLORADO-SINCE 1878 749 Main Street # Louisville CO 80027 # 303.335.4592 # www.LouisvilleCO.aov <br />`�r+�Le D1111d1I1� iJpfrvnt Cost and 2D Year Energy Cost of an Office Building <br />111 Sn SAu uv S N $i: h]W 1 Sl inn Wn $] 0n llW S5 %H GM1 $S: 1n0 $i Wn 0ai¢4:Anonn $5.000.� <br />-�_ Mixed Fuel Option 1 $2 327 633 <br />$2.810,755 <br />Mixed Fuel Option 2 $t 7$6 323 <br />$3,534.971 <br />33 Mixed Fuel Option 3 $4.492,873 <br />$2.5sa,74e <br />36 All -Electric Option 1 <br />31.948-716 <br />53,546.702 <br />35 <br />All -Electric Option 2 <br />$3,789,170 <br />$2.433.150 <br />35 21 <br />25 All -Electric Option 3 <br />$2.534,531 $3,464,384 <br />26 All -Electric Option 4 <br />$2,785,371 $4.005,694 <br />28 <br />■ First Cost s Annual Energy Cost t20 yrs, 3% inflalionl <br />Retail Building <br />Upfront Cost and 20 Year Energy Cost of a Retail Building <br />$0 $1,000.000 $2,000,000 53.000.000 $4,000,000 $5,009,000 56.000,fl0Q <br />Mixed Fuel option, � $570.500 <br />$4,419,969 <br />Mixed Fuel Option 2 1�$456-000 <br />$4,9©8,761 <br />�I 95■� Mixed Fuel Option 3 � $630.500 <br />$4.248,087 <br />86 9W AII-Electric Option 1 ! 5660.000 <br />88.■ 34 All -Electric Option 2 � s708.0o0 <br />79 <br />All-Eteciric Option 3 316 5Q0 <br />75 � $4.204.971 <br />63 ■ First Cost ■ Annual Energy Cast (20 yrs, 3% inflation) <br />Gatto joined the meeting. <br />$5.190.312 <br />$4.9-12.434 <br />Giese asked how, in a Multifamily building, how could the cost be maintained if each unit was individually <br />metered. [refer to page 36 of the meeting packet]. Schlaepfer and McCollough explained that it is more of a <br />design standard than an operational target. Compliance for the code would be met with the energy model. <br />Giese said he did not see how the model would be inline with the actual implementation if each unit has it's <br />own meter and that the model does not fit real installation. Schlaepfer further explained that once the building <br />
The URL can be used to link to this page
Your browser does not support the video tag.