Laserfiche WebLink
WLilouxsuyi , v�lle Department of Planning and Building Safety <br />L <br />COLORADO.SINCE 1878 749 Main Street • Louisville CO 80027 # 303.335.4592 # www.LouisvilleCO.aov <br />LesE <br />Effic <br />Option Spectrum: For Discussion <br />Strategic steps down the continuum <br />OR <br />Move all at once <br />(Regional Code Cohort effort is pursuing stepped options over time <br />with Resolutions to adopt net zero code by 2030) <br />Current Code <br />EUI Taraets <br />­1 — <br />Mor, <br />Preferred <br />ent <br />Tic <br />Current Code <br />All -electric new <br />17) � m1r 4 oAi <br />net zero <br />Appendix CC <br />ient <br />Schlaepfer reiterated that the Board's input is very necessary and helpful when trying to decide which path to <br />choose and that a potential recommendation could be a stepped approach to start at the left end of the <br />spectrum and takes steps in the future. <br />Schlaepfer also reiterated that Phase I of the Regional Cohort is to get all the communities to adopt the 2021 <br />IECC plus electric preferred and PV preferred. Phase 11 would begin in August to begin a roadmap to net -zero <br />energy codes. <br />Geise thanked the external groups for the slideshow presentation. <br />Betzhold encouraged the Board to continue to research the options presented and the plan is to bring back <br />information back to this Board in September. <br />Knapp asked if there was any further information for research. Schlaepfer answered that the slideshow was <br />available as well as the information on the Engage Louisville website. <br />