Laserfiche WebLink
Buildina 1. facina South Boulder Road (South Elevation <br />PRE -STAINED CEM ENT40US <br />LAP SONG STYU- <br />9M 213T40 <br />RE HULK STANCA <br />WFF➢T $7Y4E <br />STUCCO FptiISH STYLE: ski 213740 <br />M AF 96s <br />-THUNDER. EMI <br />K <br />j'�ij <br />T <br />4!�pROPOSEn CAAMK <br />Building 2 is a two-story structure that also contains retail on the ground floor and <br />offices on the second floor (7,295 square feet per floor or 14,590 square feet total). The <br />building is located towards the center of the site with entrances facing South Boulder <br />Road and northwards into the site. <br />Building 2 consists of mostly flat roofs with butterfly roofs on the east and west sides of <br />the building. It has the same materials as building 1, excluding the metal siding accent <br />areas. The building has similar varied forms, which are broken up by a combination of <br />the entry fascias and a transitioning of stucco to other materials between many first and <br />second story areas. <br />Building 2, facing South Boulder Road (South Elevation) <br />=M=....... <br />t—FM"&rA awx eq�r.oue �OIANOUMEWmi. <br />/ ira.r� }frLl �rru , �aIOMMCAI■ uF fftqu <br />irwfwwT MIM SH AY I Wxlr�n qxr ftftk o <br />}Y!k} -w4w Yltii [iMT i � ONR <br />SPO <br />--� <br />TMI <br />Building 3 is an 8,539 square -foot three-story structure with retail on the ground floor <br />(3,472 square feet) with office on the second and third floor areas (4,164 and 633 <br />square feet respectively). The height of the building is 40ft 5in. It exceeds the 40ft <br />maximum per the GDP and requires a waiver. The building is located towards the <br />center of the site with entrances facing South Boulder Road and northwards into the <br />site. <br />North End Block 11 — GDP Amendment, PUD Amendment, and Final Plat Page 7 of 30 <br />PC — November 10, 2022 <br />