Laserfiche WebLink
2/8/?8/.oa, <br />ki,i/9•m <br />co <br />co <br />" m <br />Il\I <br />a <br />co <br />0 <br />N <br />0 <br />m <br />f3 <br />0 <br />wwwwMINI <br />0 <br />F- <br />a <br />noimw <br />a <br />w•w� <br />LEGAL DESCRIPTION: <br />Lots 4 & 5, Block 4, Replat D, The Business Center at C.T.C. <br />Louisville, Colorado <br />PROJECT AREA: <br />5.15 Acres <br />PROPOSED USE: <br />Any uses allowed in City of Louisville Industrial zone district(s) <br />PROJECT INTENT: <br />The Project proposes development of 2 detached buildings on individual adjacent lots. The one story building on Lot 5 is oriented with its street <br />front facing CTC Boulevard towards the west. The building entry includes a sidewalk connection to a new sidewalk along CTC Boulevard. All <br />loading and utility services are on the rear (east) of the building and screened from view of the commercial use adjacent to the north. The two <br />story building on Lot 4 is oriented with its street front facing Dogwood Avenue to the south. The building entry includes a sidewalk connection <br />to the existing sidewalk along Dogwood. All loading facilities and utility services for this building are located on its east side and screened from <br />view. The Project anticipates shared tenancy between the buildings and includes a pedestrian sidewalk connection linking the two; joint use of <br />three proposed driveway accesses; a single shared retention facility at the southeast corner of Lot 4; and, cooperative cross -access and <br />parking between the two lots (see PROPERTY OWNERSHIP AND JOINT USE AGREEMENTS below). <br />LAND USE: <br />Building footprint <br />Driveways/Parking/Sidewalks <br />Landscaping <br />Site Area <br />Building Height <br />PARKING: <br />Building Area <br />Standard Parking <br />HC Parking <br />Total Parking <br />Average parking ratio sf per sp <br />Average parking ratio sp per 1000 <br />Bicycle parking <br />EXTERIOR MATERIALS: <br />Walls <br />Sloping Roofs <br />Window Framing <br />Glazing <br />Flat Roof <br />Mechanical Screen <br />LOT 4 <br />20,231 sf 16.8% <br />57,902 sf 48.1% <br />42,281 sf 35.1 <br />120,414 sf 100.0% <br />40ft/2story <br />LOT 5 <br />28,690 sf <br />48,680 sf <br />27,124 sf <br />104,494 sf <br />20ft/1 story <br />LOT 4 LOT 5 COMBINED <br />40,728 sf 28,690 sf 69,418 sf <br />141 sp 58 sp 199 sp <br />4sp 2sp 6sp <br />145 sp 60 sp 205 sp <br />280 478 338 <br />sf 3.56 2.09 2.95 <br />8sp 8sp 16sp <br />27.4°A) <br />46.6% <br />26.0% <br />100.0% <br />Painted precast concrete with accent reveals (minimum 2 colors) <br />Prefinished standing seam metal rooting <br />Aluminum storefront framing system <br />Tinted insulating glazing <br />Epdm membrane roofing with river rock ballast <br />Painted vertical ribbed steel decking (if screening is required per IDDSG) <br />See color rendered exterior elevations and exterior material sample pallete submitted separately. <br />COMBINED <br />48,921 sf 21.8 % <br />106,582 sf 47.4 % <br />69,405 sf 30.8 <br />224,908 sf 100.0% <br />PROJECT PHASING: <br />Construction of Project will commence within 2 months following approval of this PUD by the City of Louisville. Site improvements and core and <br />shell building construction will be complete within 8 months following commencement of construction. <br />EXTERIOR LIGHTING: <br />In addition to the pole and bollard lighting indicated on the Exterior Lighting Plan, each recessed building entry shall include soffit mounted <br />recessed downlights. <br />SIGNAGE: <br />The Project proposes 4 double faced exterior lit monument signs (2 per lot) located as indicated on the Site Plan. Monument signs shall be <br />limited to 25 sf per face. Other signage shall conform to the Industrial Development Design Standards & Guidelines. <br />PROPERTY OWNERSHIP AND JOINT USE AGREEMENTS: <br />Lots 4 and 5 are currently in common ownership. Should this circumstance change in the future, the separate owners of Lots 4 and 5 will <br />execute joint agreements for cooperative use of vehicular access, internal sidewalks and drainage facilities. <br />DEVIATIONS FROM INDUSTRIAL DEVELOPMENT DESIGN STANDARDS & GUIDELINES: <br />Required detention from Lot 4 is included within a shared pond on the east side of Lot 4 (See PROPERTY OWNERSIIP AND JOINT UGC <br />AGREEMENTS above). <br />FUTURE TENANT FINISH: <br />Parking requirements will be reviewed during the building permit process for individual tenant finishes_ No tenant finish permits or certificates of <br />occupancy will be issued if the combined parking of the various uses as required by the IDDSG exceeds the total provided parking on each site. <br />OTHER CONDITIONS: <br />The final design of the northern driveway onto CTC Boulevard shall be subject to final approval during the civil plan review process. The <br />applicant shall agree to coordinate with the property owner to the north for a possible shared driveway, unless that proves a technical or timing <br />impossibility. <br />The applicant shall dedicate a public sidewalk easement along CTC Boulevard at or prior to recording of the final PUD. <br />Cross access and shared detention easements/agreements shall be recorded at or prior to recording of the final PUD. <br />An off -site grading easement for the property east of Lot 4 shall be recorded at or prior to recording of the final PUD. <br />FINAL P.U.D. DEVELOPMENT PLAN <br />Lots 4 & 5, Block 4, Replat D <br />THE BUSINESS CENTER AT CTC <br />THE BUSINESS CENTER AT CTC <br />W <br />.m, <br />REPLAT C <br />THE PARK AT CTC <br />Vicinity Map <br />SHEET INDEX <br />A00 Cover Sheet <br />A01 Site Plan <br />A02 Ext. Elevations - Lot 4 <br />A03 Ext, Elevations - Lot 5 <br />C1 Grading/Drainage/Master Utility Plan <br />LO1 Landscaping Plan <br />El Site Lighting Calculations Plan <br />0 <br />STATE HIGHWAY 42 <br />TAYLOR AVENUE <br />PROJECT <br />ti <br />REPLA T Dct <br />Nt- <br />cn <br />1 <br />0 <br />DOGWOODT <br />• <br />CHERRY STREET <br />0 <br />OWNERSHIP SIGNATURE BLOCK: <br />By signing this PUD, the owner acknowledges and accepts all the requirements and intent set forth in this PUD. <br />Witness our hands and seal this 20th day of April, 2001. <br />Owner Lot 4, Block 4, The Business Center at CTC Replat D <br />Owner Lot 5, Block 4, The Business Center at CTC Replat D <br />400,4 <br />Manager, CTC Office LLC Manager, CTC Shop LLC <br />• <br />• <br />`)44.444k."14•444 <br />Notary <br />PLANNING COMMISSION CERTIFICATE: <br />MICHELE MILLER <br />NOTARY PUBLIC <br />STATE OF COLORADO <br />My Commission Expires August 22, 2fitY3 <br />Recommended approval this I. day Ft,\ r o. , 2001 by the planning commission of the city of Louisville, Colorado. <br />Resolution No. <br />11 <br />CITY COUNCIL CERTIFICATE: <br />series 0 O 1 <br />Secretary <br />Approved this V day rik Gf On. , 2001 by the city council of the city of Louisville, Colorado. <br />Resolution No. I 5 series <br />Mayor <br />CLERK AND RECORDER CERTIFICATE (County of Boulder, State of Colorado): <br />I hereby certify that this instrument was filed in my office atg: 14 o'clock, A .M., this 7 .day <br />is recorded in plan file p.54 ,fee 4 7b paid <br />y; -it 16latl$+ 11,2921,2 - <br />CharloYe Iw1tn <br />Recorder <br />film No <br />,2001 and <br />, reception 4212 [ 9!1 <br />Deputy <br />P-614 Fab q*)14 Che) <br />JM Associates, Inc. <br />PROPOSED BUII,DINGS <br />Q <br />0 <br />cu <br />V <br />I) <br />b <br />4 <br />0 0 <br />'6' U <br />0 <br />U <br />0 <br />01 14 <br />vit <br />■ <br />N <br />• N <br />N • O <br />Lin <br />v o <br />• c <br />m <br />c <br />`l o <br />N• U, <br />oe <br />cr. zt <br />oN.8 <br />o • m-6 <br />-c @j <br />A00 <br />11/21/00 <br />02MiR0l <br />O4 <br />FINAL RV <br />REVISED <br />wviseo <br />7 <br />