Laserfiche WebLink
Boulder County, CO 03995276 <br />3 of 15 <br />GENERAL NOTES <br />1. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK. PRIOR TO EXCAVATION, UNDERGROUND UTILITIES MUST BE <br />FIELD VERIFIED. PROTECT ALL EXISTING SITE FEATURES TO REMAIN FROM POTENTIAL DAMAGE BY SITE CONSTRUCTION <br />OPERATIONS. AVOID ANY WORK BEYOND SCOPE OF PROJECT AREA. <br />2. ALL LANDSCAPING AND IRRIGATION CONSTRUCTION MUST BE IN ACCORDANCE WITH ALL APPLICABLE MUNICIPAL CODES <br />AND DEVELOPMENT STANDARDS; UNIFORM BUILDING CODES; PERMIT CONDITIONS; AND ALL OTHER APPLICABLE CODES, <br />ORDINANCES, STANDARDS, AND POLICIES. <br />3. LANDSCAPE CONTRACTOR SHALL COORDINATE THE INSTALLATION SCHEDULE WITH THE DEVELOPER AND/OR GENERAL <br />CONTRACTOR TO AVOID CONFLICTS AND DELAYS IN CONSTRUCTION. ALL ACCESS TO SITE, USE OF UTILITIES, STORAGE, <br />AND OTHER REQUIREMENTS SHALL BE COORDINATED PRIOR TO BEGINNING WORK. <br />4. CONTRACTOR IS RESPONSIBLE TO INSPECT AND CONFIRM SITE CONDITIONS PRIOR TO BEGINNING WORK. <br />COMMENCEMENT OF WORK SHALL SIGNIFY ALL CONDITIONS ARE ACCEPTABLE AND NO ALLOWANCE WILL BE MADE FOR <br />UNRECOGNIZED CONDITIONS AFTER START OF WORK. <br />5. CONTRACTOR IS RESPONSIBLE TO CONFIRM USE OF THE MOST CURRENT DESIGN DRAWINGS PRIOR TO BEGINNING WORK. <br />A COPY OF THE APPROVED PLANS MUST BE ON -SITE WHENEVER CONSTRUCTION IS IN PROGRESS. <br />6. NOTIFY OWNER/LANDSCAPE ARCHITECT IMMEDIATELY UPON DISCOVERY OF UNFORESEEN SITE CONDITIONS OR PLAN <br />DISCREPANCIES. NO CHANGE TO SPECIFIED WORK SHALL BE COMPLETED WITHOUT VERIFICATION OF EXISTING <br />CONDITIONS AND WRITTEN APPROVAL OF MODIFICATION BY THE LANDSCAPE ARCHITECT. <br />7. IF CONDITIONS DO NOT ALLOW STRICT CONFORMANCE TO THE NOTES AND DETAILS, THE CONTRACTOR SHALL REQUEST <br />APPROVAL FROM THE OWNER/OWNERS REPRESENTATIVE & CITY OF LOUISVILLE BEFORE PERFORMING WORK IN AN <br />ALTERNATIVE MANNER, FIELD CHANGES TO THESE PLANS ARE TO BE APPROVED BY THE CITY OF LOUISVILLE PRIOR TO ANY <br />WORK. FIELD CONDITIONS THAT CONFLICT WITH OR JEOPARDIZE THE LONGEVITY OF THE PROPOSED IMPROVEMENTS <br />SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER/OWNERS REPRESENTATIVE AND THE CITY OF LOUISVILLE FOR <br />RESOLUTION. FAILURE TO BRING SUCH MATTERS TO THE OWNERS/TOWN'S ATTENTION OR TO OBTAIN APPROVAL OF <br />REMEDIAL MEASURES WILL IN NO WAY RELIEVE THE CONTRACTOR OF THEIR OBLIGATION TO RESOLVE THE MATTER TO THE <br />SATISFACTION OF THE OWNER/OWNERS REPRESENTATIVE AND THE CITY OF LOUISVILLE. <br />8. THE CITY OF LOUISVILLE RESERVES THE RIGHT TO MODIFY INFORMATION FOR CONFORMANCE TO CITY CODE/POLICY. <br />9. IRRIGATION AND LANDSCAPE DRAWINGS WILL REQUIRE STAFF APPROVAL PRIOR TO CONSTRUCTION. <br />SURVEY & BASE INFORMATION <br />1. ALL SURVEY AND BASE INFORMATION HAS BEEN PROVIDED BY PROOF CIVIL CONSULTING ENGINEERS_ CONTRACTOR SHALL <br />COORDINATE ALL BACKGROUND INFORMATION WITH OTHER CONSULTANTS PRIOR TO START OF WORK. <br />PERMITS & INSPECTIONS <br />1. CONTRACTOR SHALL OBTAIN APPLICABLE LICENSES, STANDARDS, SPECIFICATIONS, PERMITS, BONDS, ETC. WHICH ARE <br />NECESSARY TO PERFORM THE WORK PRIOR TO THE COMMENCEMENT OF ANY WORK <br />2. CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE OWNER/OWNERS REPRESENTATIVE AT LEAST 48 HOURS PRIOR <br />TO START UP OR RESTART OF ANY WORK. <br />3. THE CONTRACTOR SHALL NOTIFY THE OWNER/OWNERS REPRESENTATIVE, AND/OR MUNICIPAL INSPECTOR AT LEAST 48 <br />HOURS PRIOR TO THE DESIRED INSPECTION. <br />SITE CONDITIONS <br />1. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE CONDITIONS AT THE WORK SITE, INCLUDING THE SAFETY OF <br />ALL PERSONS AND PROPERTY, DURING THE PERFORMANCE OF THE LANDSCAPE WORK_ THIS REQUIREMENT SHALL APPLY <br />CONTINUOUSLY, AND SHALL NOT BE LIMITED TO NORMAL WORKING HOURS. <br />2. THE CONTRACTOR SHALL COORDINATE WITH ALL OTHER DISCIPLINES AND PROVIDE ADDITIONAL SIGNS, BARRICADES, <br />FLAGPERSONS, OR OTHER DEVICES NECESSARY TO PROVIDE FOR PUBLIC SAFETY FOR THE DURATION OF LANDSCAPE <br />CONSTRUCTION. <br />3_ THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS, ELEVATIONS, AND OTHER CONDITIONS PRIOR TO BIDDING, <br />ORDERING OR FABRICATION OF ANY MATERIAL, AND PRIOR TO UNDERTAKING ANY PORTION OF THE WORK. REPORT ANY <br />DISCREPANCIES TO THE OWNER. ANY DEVIATION FROM THESE PLANS MUST BE APPROVED BY THE OWNER PRIOR TO <br />CONSTRUCTION. <br />4. THE LANDSCAPE CONTRACTOR SHALL INSURE THAT THEIR WORK DOES NOT IMPACT ESTABLISHED OR PROJECTED <br />DRAINAGE PATTERNS. <br />PROTECTION <br />1. AT ALL TIMES THE CONTRACTOR SHALL TAKE PRECAUTIONS FOR PROTECTION OF EXISTING PUBLIC AND PRIVATE <br />INSTALLATIONS THAT MAY BE ENCOUNTERED DURING CONSTRUCTION. ANY DAMAGED INSTALLATIONS, PUBLIC OR PRIVATE, <br />SHALL BE REPAIRED IMMEDIATELY AT THE CONTRACTOR'S EXPENSE. <br />UTILITIES <br />1. UNDERGROUND UTILITIES MUST BE FIELD VERIFIED. LOCATION OF UTILITIES SHOWN ON THE PLANS ARE APPROXIMATE AND <br />NOT NECESSARILY COMPLETE. OWNER AND CONSULTANTS ASSUME NO RESPONSIBILITY FOR THE LOCATIONS AND <br />ACCURACY OF UTILITIES SHOWN. CALL THE UTILITY NOTIFICATION CENTER OF COLORADO (600) 922-1987 FOR UTILITY <br />LOCATES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING UTILITY LOCATIONS PRIOR TO THE START OF WORK. <br />CONTRACTOR SHALL NOTIFY OWNER OF ANY CONDITIONS THAT VARY FROM PLANS PRIOR TO CONSTRUCTION. <br />2. CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL UTILITIES AND REPAIR OF UTILITIES IF DAMAGED_ <br />REPAIR SHALL BE DONE AT NO ADDITIONAL COST TO THE OWNER. ALL WORK IN UTILITY EASEMENTS SHALL BE PERFORMED <br />ACCORDING TO THE REQUIREMENTS OF THE GOVERNING AGENCY. <br />CONTRACTOR STAGING AND ACCESS <br />1. THE CONTRACTOR SHALL LIMIT CONSTRUCTION ACTIVITIES TO THOSE AREAS WITHIN THE LIMITS OF WORK. THE <br />CONTRACTOR, AT THEIR OWN EXPENSE, SHALL RESTORE ANY DISTURBANCE BEYOND THESE LIMITS TO ORIGINAL <br />CONDITION. <br />AS-BUILTS <br />1. CONTRACTOR SHALL KEEP CURRENT A SET OF CONSTRUCTION RECORD DRAWINGS ('AS-BUILTS') ON SITE AT ALL TIMES. <br />LABEL EACH DOCUMENT "RECORD DOCUMENT". MARK ALL INFORMATION WITH CONTRASTING COLOR USING INK. KEEP <br />EACH RECORD CURRENT. DO NOT PERMANENTLY CONCEAL ANY WORK UNTIL REQUIRED INFORMATION IS RECORDED. <br />MAINTAIN RECORD DOCUMENTS IN A CLEAN, DRY, LEGIBLE CONDITION, APART FROM DOCUMENTS USED FOR <br />CONSTRUCTION. <br />2. THE LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING "AS -BUILT" DRAWINGS OF THE INSTALLED <br />LANDSCAPE AND IRRIGATION TO THE OWNER. <br />THAN RAOTBALL <br />ti <br />ilIIIlsiII lllAIlI= <br />MIN. 2 X ROOTBALL <br />DIAMETER <br />SHRUB AND PERENNIAL DETAIL <br />SCALE NOT 10 SCALE <br />FINISH GRADE. SEE PLANTING PLAN <br />FOR GROUND COVER TREATMENT <br />SHREDDED BARK MULCH, 3" MIN. <br />DEPTH. ROUGHLY THE EXTENTS OF <br />ROOTBALL <br />PLANT ROOT BAIL. SET TOP <br />ROOTBALL 2" ABOVE AD,IECENT <br />GRADE. IN BERMED AREAS SET <br />ROOTBALL 2" ABOVE LOITER <br />AD,FCENT GRADE - INSTALL WATER <br />RING (2 - 3" FIT.) <br />BACKFILL AUX (PER PLANTING <br />SPECIFICATIONS). AMEND AND <br />FERTILIZE ONLY AS RECOMMENDED IN <br />SOIL FERTILITY ANALYSIS. JET <br />BACKFILL KITH WATER TO ELIMINATE <br />VOIDS. <br />0 COMPACTED BACKFILL MIX (75%). <br />0 UNDISTURBED NATIVE SDIL <br />PLANTING SPECIFICATIONS: <br />1. LANDSCAPE CONTRACTOR SHALL PROVIDE PLANT MATERIALS THAT SHALL MEET OR EXCEED CURRENT AMERICAN <br />STANDARD FOR NURSERY STOCK ANSI Z60.1 AND THE COLORADO NURSERY ACT AND ACCOMPANYING RULES AND <br />REGULATIONS UNLESS OTHERWISE SPECIFIED. <br />2. ALL PLANT MATERIAL SIZES SPECIFIED ARE MINIMUM SIZES. ALL CONTAINER AND TREE CALIPER SIZES ARE MINIMUM. <br />CONTAINER OR CALIPER SIZE MAY BE INCREASED IF NECESSARY TO PROVIDE OVERALL PLANT SIZE SPECIFIED <br />3. PRIOR TO PLANTING INSTALLATION, THE CONTRACTOR SHALL CONFIRM THE AVAILABILITY OF ALL THE SPECIFIED PLANT <br />MATERIALS AND MAKE ARRANGEMENTS WITH THE LANDSCAPE ARCHITECT TO REVIEW PLANT MATERIALS AT LEAST 2 <br />WEEKS PRIOR TO PROCUREMENT AND DELIVERY TO THE JOB SITE. <br />4. ALL PLANT MATERIAL SHALL BE SUBJECT TO APPROVAL AT THE JOB SITE BY THE LANDSCAPE ARCHITECT PRIOR TO <br />INSTALLATION. WHEN DELIVERED PLANT MATERIAL DOES NOT COMPLY WITH THE REQUIREMENTS, THE LANDSCAPE <br />ARCHITECT RESERVES THE RIGHT TO REJECT SUCH PLANTS AND REQUIRE THE LANDSCAPE CONTRACTOR TO REPLACE <br />REJECTED WORK AND CONTINUE SPECIFIED MAINTENANCE UNTIL RE -INSPECTED AND FOUND TO BE ACCEPTABLE. <br />5. NO PLANT SUBSTITUTIONS WILL BE PERMITTED WITHOUT PRIOR WRITTEN APPROVAL FROM THE LANDSCAPE ARCHITECT. <br />IF SPECIFIED PLANT MATERIALS ARE NOT AVAILABLE, IDENTIFY THE EXTENT AND QUANTITY IN WRITING TOGETHER WITH A <br />RECOMMENDED SUBSTITUTION THAT MEETS OR EXCEEDS THE INITIAL REQUIREMENT. <br />6. CONTRACTOR SHALL COORDINATE FINAL TREE LOCATIONS WITH ALL OTHER DISCIPLINES. PROVIDE 5' MINIMUM SPACING <br />FROM UTILITIES. <br />7. CONTRACTOR SHALL VERIFY AND MAINTAIN ALL SETBACKS, CLEAR ZONES AND SIGHT TRIANGLES REQUIRED BY ALL <br />LOCAL AND MUNICIPAL CODES WHERE APPLICABLE. <br />B. LANDSCAPE CONTRACTOR SHALL LOCATE AND STAKE ALL TREES, SHRUBS AND PLANTING BEDS ACCORDING TO <br />LOCATIONS SHOWN ON DRAWINGS. ALL PLANTING STAKE LOCATIONS SHALL BE SUBJECT TO REVIEW AND APPROVAL BY <br />OWNER PRIOR TO THE START OF PLANTING OPERATIONS. LANDSCAPE CONTRACTOR SHALL MAKE MODIFICATIONS IN <br />STAKE LOCATIONS AS DIRECTED BY OWNER. <br />9. ALL PROPOSED TREES SHALL BE INSTALLED EITHER ENTIRELY IN OR ENTIRELY OUT OF PLANTING BEDS. IF TREES ARE <br />LOCATED OUTSIDE PLANTING BEDS IN SOD AREAS, MAINTAIN A MINIMUM 3' WIDE OFFSET TO ALLOW FOR MOWERS TO <br />MANEUVER. <br />10. TREES PLANTED WITHIN THE RIGHT-OF-WAY AND WITHIN FIVE FEET FROM THE BACK OF CURB OR SIDEWALK WILL <br />REQUIRE INSTALLATION OF A ROOT BARRIER. <br />11. THE LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR THE STABILITY AND PLUMB CONDITION OF ALL INSTALLED <br />PLANT MATERIALS AND REPLACING ANY DAMAGED PLANT MATERIAL. WITH PLANTS OF EQUAL KIND, SIZE AND CONDITION <br />AT NO ADDITIONAL COST TO THE OWNER. THE CONTRACTOR SHALL REMOVE ALL STAKING MATERIALS THE END OF THE <br />WARRANTY PERIOD AND DISPOSE OFFSITE. <br />12. CONTRACTOR SHALL HAND DIG ALL PLANTING PITS ADJACENT TO UTILITIES. <br />13. ALL TREES SHALL HAVE TREE WRAP INSTALLED AND PROVIDED PER TYPICAL NURSERY STANDARDS FOR THE FIRST <br />WINTER SEASON. <br />14. LANDSCAPE CONTRACTOR SHALL PROVIDE PLANT PROTECTION AND DELIVERY AS FOLLOWS: <br />A. ALL PLANT MATERIAL SHALL BE PROTECTED, FROM TIME OF DIGGING TO TIME OF FINAL ACCEPTANCE, FROM INJURY, <br />EXCESSIVE DRYING FROM WINDS, IMPROPER VENTILATION, OVER -WATERING, FREEZING, HIGH TEMPERATURES, OR <br />ANY OTHER CONDITION DAMAGING TO PLANTS. <br />B. PLANT MATERIAL SHALL BE PLANTED ON THE DAY OF DELIVERY IF POSSIBLE_ ALL PLANTS NOT PLANTED ON THE DAY <br />OF DELIVERY SHALL BE PLACED IN A TEMPORARY NURSERY AND KEPT MOIST, SHADED, AND PROTECTED FROM THE <br />SUN AND WIND. EACH ROOTBALL SHALL BE COVERED ENTIRELY WITH MULCH. ALL PLANT MATERIALS SHALL BE <br />INSTALLED PER THE PLAN DRAWINGS AND SPECIFICATIONS. <br />14. LANDSCAPE CONTRACTOR SHALL GUARANTEE SOD AND IRRIGATED PLANT MATERIAL FOR A PERIOD OF ONE (1) YEAR <br />FROM THE DATE OF INITIAL ACCEPTANCE BY OWNER. <br />15. LANDSCAPING SHALL BE CONTINUOUSLY MAINTAINED. MAINTENANCE SHALL INCLUDE ALL REASONABLE AND REGULAR <br />IRRIGATION; WEED CONTROL; FERTILIZING; PRUNING; TRASH REMOVAL SNOW AND ICE REMOVAL; TREATMENT OF PLANT <br />MATERIAL THAT SHOW SIGNS OF INSECT PESTS; DISEASES OR DAMAGE; AND REPLACEMENT OF DEAD OR DAMAGED <br />PLANT MATERIAL AS SET FORTH IN THE APPROVED PLAN SET. <br />16. LANDSCAPE CONTRACTOR TO REMOVE TREE STAKES, TREE WRAP, AND ALL DEAD WOOD ON TREES AND SHRUBS AT THE <br />END OF THE ONE YEAR GUARANTEE PERIOD. <br />SOIL SPECIFICATIONS: <br />1. ANY PLANTING AREA THAT DOES NOT MEET THE FOLLOWING SOIL PREPARATION REQUIREMENTS ARE SUBJECT TO <br />REJECTION AT LANDSCAPE ARCHITECTS/OWNERS REPRESENTATIVES DISCRETION. <br />2. LANDSCAPE CONTRACTOR IS REQUIRED TO NOTIFY LANDSCAPE ARCHITECT/OWNERS REPRESENTATIVE A MINIMUM <br />OF 24 HOURS PRIOR TO BEGINNING SOIL PREP WORK. SOIL PREP NOT INSPECTED BY LANDSCAPE <br />ARCHITECT/OWNERS REPRESENTATIVE IS SUBJECT TO REJECTION AT ANYTIME PRIOR TO INITIAL ACCEPTANCE. <br />3. LANDSCAPE CONTRACTOR SHALL SUBMIT DELIVERY (TRIP) TICKETS TO LANDSCAPE ARCHITECT/OWNERS <br />REPRESENTATIVE FOR ALL ORGANIC SOIL AMENDMENTS WITHIN 24 HOURS AFTER DELIVERY . <br />4. TOPSOIL SHALL BE FERTILE, FRIABLE, SANDY LOAM FROM THE 'A' HORIZON AND SHALL BE FREE OF STONES OVER <br />.75" IN DIAMETER, REFUSE, PLANTS OR THEIR ROOTS, STICKS, NOXIOUS WEEDS, SALTS, SOIL STERILANTS, OR <br />OTHER MATERIAL WHICH WOULD BE DETRIMENTAL TO PLANT GROWTH. <br />5. ORGANIC SOIL AMENDMENT SHALL CONSIST OF DRY, WELL -ROTTED, PULVERIZED, AGED MINIMUM ONE YEAR <br />ORGANIC COMPOST CLASS 1 TYPE SUCH AS AVAILABLE FROM A 1 COMPOST, JENSEN SALES. PULVERIZED HORSE, <br />SHEEP OR DAIRY COW MANURE NOT ACCEPTABLE. SUBMIT DATED RECENT MATERIAL ANALYSIS TO LANDSCAPE <br />ARCHITECT/OWNERS REPRESENTATIVE TO GUARANTEE PRODUCT CONDITION AND PROOF NO LIVE WEED SEEDS <br />AND CHEMICAL ADDITIVES ARE PRESENT. <br />6. SOIL PREPARATION FOR AREAS TO BE SODDED SHALL INCLUDE TOPSOIL AND ORGANIC MATTER ADDED AT A RATE <br />OF FIVE CUBIC YARDS PER ONE THOUSAND SQUARE FEET AND TILLED EIGHT (8) INCHES INTO THE SOIL. INCREASE <br />AMENDMENT QUANTITIES AS NEEDED PER SOILS TEST RECOMMENDATIONS. <br />7. PREPARED BACKFILL FOR TREE/SHRUB PLANTING SHALL BE A MIX OF 2/3 IMPORTED/ SALVAGED TOPSOIL AND 1/3 <br />ORGANIC SOIL AMENDMENT. WHERE TREES AND SHRUBS ARE LOCATED IN LARGE BEDS PROVIDE SOIL <br />AMENDMENT AT A RATE OF FIVE CUBIC YARDS PER ONE THOUSAND SQUARE FEET AND TILL EIGHT INCHES INTO THE <br />SOIL THROUGHOUT THE ENTIRE PLANTING BED, NOT JUST IN EXCAVATED PLANTING HOLES. <br />EDGING: <br />1. EDGING: 3/16" X 5 1/2" GREEN PAINTED "RYERSON TYPE" METAL EDGING WITH MILLED EDGE AND ANCHOR STAKES <br />PER MANUFACTURER'S RECOMMENDATIONS OR APPROVED EQUAL. <br />2. EDGING THAT INTERSECTS / TERMINATES AT SITE ELEMENTS SHALL MEET AT PERPENDICULAR ANGLES. <br />3. PLANTING BED OUTLINES SHALL NOT BE OBSTRUCTED AND SHALL BE SMOOTH AND FLOWING <br />4. EDGING THAT TERMINATES ADJACENT TO SIDEWALKS, STONE EDGING, ETC SHALL BE FLUSH OR DEPRESSED BELOW <br />THE FINISHED GRADE OF THE ADJACENT SURFACE. <br />5. WHERE EDGING OVERLAPS, THE TOP OF THE EDGING SHALL BE EVEN WITH NO PROTRUDING CORNERS OR EDGES. <br />EVERGREEN <br />TREE <br />DECIDUOUS <br />TREE <br />3X ROOTBAI 1 I)IA- <br />TREE PLANTING DETAIL <br />SCALE: NDT TO SCALE <br />0 TREE CANOPY. <br />0 NYLON TREE STRAPS AT ENDS OF WIRES - SECURE <br />TO STAKE OR DEADMEN WITHNAILS. <br />0 12 GAUGE GALVANIZED WIRE. SECURE TO TRUNK <br />JUST ABOVE LOWEST MAJC)R BRANCHES. <br />0 <br />0 <br />Q <br />ID <br />11 <br />12 <br />13 <br />14 <br />24" X 3/4" P.V.C. MARKERS OVER WIRES. <br />PRESSURE -TREATED WOOD STAKE, 2' DIA. EXTEND <br />STAKES 12- MIN. INTO UNDISTURBED SOIL <br />PRESSURE -TREATED WOOD DEADMEN, TWO PER <br />TREE (MIN.). BURY OUTSIDE OF PLANTING PIT AND <br />18" MIN. INTO UNDISTURBED SOL <br />TRUNK FLARE. <br />WOOD MULCH TREE RING 3' DIA MIN. TYPE AND <br />DEPTH PER PLANS. DO NOT PLACE MULCH WITHIN <br />3" OF TRUNK. <br />FINISH GRADE. SEE PLANTING PLAN FOR GROUND <br />COVER TREATMENT <br />ROOT BALL -SEE NOTE 3. THIS DETAIL <br />BACKFILL AMEND AND FERTILIZE ONLY AS <br />RECOMMENDED IN SOIL FERTILITY ANALYSIS. <br />UNDISTURBED NATIVE SQL <br />SOFT VELCRO, OR OTHER FABRIC WRAP <br />CENTRAL LEADER, SEE PLANTING NOTES <br />NOTES: <br />1. SCARIFY SIDES OF PLANTING PIT PRIOR TO SETTING TREE. <br />2. REMOVE EXCESS SOIL APPLIED ON TOP OF THE ROOTBALL THAT <br />COVERS THE ROOT FLARE. THE PLANTING HOLE DEPTH SHALL <br />BE SUCH THAT THE ROOTBALL RESTS ON UNDISTURBED SOIL, <br />AND THE ROOT FLARE IS 3"-5" ABOVE FINISH GRADE, <br />3. CUT OFF BOTTOM 1/3 OF WIRE BASKET BEFORE PLACING TREE <br />IN HOLE, CUT OFF AND REMOVE REMAINDER OF BASKET AFTER <br />TREE IS SET IN HOLE, REMOVE ALL NYLON LIES, NNE, ROPE, <br />AND OTHER PACKING MATERIAL REMOVE ALL BURLAP FROM <br />AROUND ROOTBALL. <br />4, TREE WRAP IS NOT TO BE USED ON ANY NEW PLANTINGS, <br />EXCEPT IN LATE FALL PLANTING SITUATIONS, AND ONLY THEN <br />AFTER CONSULTATION WITH THE LANDSCAPE ARCHITECT WHEN <br />WRAPPING TREE, WRAP FROM TRUNK FLARE TO LOWEST MAJOR <br />BRANCH. <br />5. REMOVE ALL NURSERY STAKES AFTER PLANTING. <br />6, FOR TREES OVER 3" CALIPER, USE THREE STAKES OR DEADMEN <br />(AS APPROPRIATE), SPACED EVENLY AROUND TREE. <br />7, DO NOT ALLOW AIR POCKETS TO FORM WHEN BACKFILUNG. <br />FAKING EXAMPLES (PLAN VIEW) <br />PREVAILING <br />WINDS <br />PREVAILING <br />WINDS <br />MULCH: <br />1. MULCH SETTING AND DEPTH: ALL PLANTING BEDS SHALL HAVE MULCH INSTALLED IN ACCORDANCE WITH PLAN <br />DRAWINGS, DETAILS AND SPECIFICATIONS AS NOTED BELOW. <br />A. TREES AND SHRUBS IN PLANTING BEDS - 4 INCH DEPTH OF SPECIFIED MULCH OVER GEOTEXTILE FABRIC_ <br />MULCH A MINIMUM OF 3 INCHES CLEAR FROM BASE OF PLANTS. <br />B. TREES IN LAWN AREAS - 3 FOOT DIAMETER MULCH RING WITH 3 INCH DEPTH OF CEDAR FIBER MULCH. DEPTH <br />TO BE MEASURED AFTER SETTLEMENT AND COMPACTING, UNLESS OTHERWISE NOTED ON DRAWINGS AND/OR <br />DETAILS. KEEP MULCH A MINIMUM OF 3 INCHES FROM BASE OF PLANTS. NO GEOTEXTILE SHALL BE USED FOR <br />TREES IN LAWN. <br />C. ALL PLANTS IN ROCK MULCH BED SHALL HAVE A WOOD MULCH RING 1.5X THE CONTAINER SIZE OF THE PLAN. <br />2. ROCK MULCH: A MINIMUM 4" DEPTH OF 2-4" RIVER ROCK TO MATCH EXISTING ADJACENT DEVELOPMENT. ROCK <br />MULCH WITH GEOTEXTILE FABRIC AS A WEED BARRIER. <br />3. ORGANIC MULCH: CASCADE TWICE SHREDDED CEDAR, NON -DYED OR APPROVED EQUAL A MINIMUM OF 4 INCH <br />DEPTH OVER GEOTEXTILE FABRIC. ALL ORGANIC MULCH AREAS ARE TO BE SPRAYED WITH WATER AFTER <br />INSTALLATION TO MAT DOWN MULCH. <br />4. GEOTEXTILE FABRIC (FILTER FABRIC,: UNDERLAYMENT FABRIC SHALL BE MIRAFI, MIRASCAPE, DUPONT TYPAR 3301 <br />OR APPROVED SUBSTITUTE (SUBMIT SAMPLE). <br />5. SAMPLES OF ALL MULCH TYPES SHALL BE SUBMITTED TO THE OWNER/OWNERS REPRESENTATIVE FOR APPROVAL <br />PRIOR TO INSTALLATION. THE OWNER RESERVES THE RIGHT TO MODIFY THE COLOR SELECTION AND/OR SIZE OF <br />THE MULCH DURING THE SUBMITTAL PROCESS. <br />SOD: <br />1. ALL SOD SHALL BE INSTALLED WITHIN 24 HOURS FROM THE TIME OF CUTTING ON A FIRM AND MOIST SUBGRADE. DO <br />NOT PLANT IF SOD IS DORMANT OR THE GROUND IS FROZEN. <br />2. ALL SOD SHALL BE INSTALLED PARALLEL TO SLOPES TO FORM A SOLID MASS WITH TIGHTLY FITTED JOINTS. BUTT <br />ENDS AND SIDES OF SOD STRIPS. DO NOT OVERLAP. STAGGER STRIPS TO OFFSET JOINTS IN ADJACENT COURSES. <br />3. DISC OR ROTOTILL AMENDMENTS, TOPSOIL AND EXISTING SOIL TO A DEPTH OF S", <br />4. GRADE AREAS TO RECEIVE SOD TO A SMOOTH, UNIFORM SURFACE PLANE WITH LOOSE, UNIFORMLY FINE TEXTURE. <br />GRADE TO WITHIN 1/2" +/- OF FINISH ELEVATION. ROLL AND RAKE. REMOVE RIDGES AND FILL DEPRESSION TO MEET <br />FINISH GRADES. <br />5. ALL SOD SHALL BE 2ND GENERATION TEXAS HYBRID BLUE GRASS "DURABLUE" OR "THERMAL BLUE" SOD THAT IS <br />LOCALLY GROWN. FOR SUBSTITUTION APPROVAL CONTACT THE OWNER'S REPRESENTATIVE OR LANDSCAPE <br />ARCHITECT. <br />DOCUMENT NOTE <br />1. IRRESPECTIVE OF ANY OTHER TERM IN THIS DOCUMENT, LANDSCAPE ARCHITECT SHALL NOT CONTROL OR BE <br />RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SCHEDULES, SEQUENCES OR PROCEDURES, OR <br />FOR CONSTRUCTION SAFETY OF ANY OTHER RELATED PROGRAMS, OR FOR ANOTHER PARTIES; ERRORS OR OMISSIONS, <br />OR FOR ANOTHER PARTIES' FAILURE TO COMPLETE THEIR WORK OR SERVICES IN ACCORDANCE WITH THE LANDSCAPE <br />ARCHITECTS DOCUMENTS. <br />IRRIGATION <br />1. REFER TO IRRIGATION PLANS FOR LIMITS AND TYPES OF IRRIGATION DESIGNED FOR THE LANDSCAPE. IN NO CASE SHALL <br />IRRIGATION BE EMITTED WITHIN THE MINIMUM DISTANCE FROM BUILDING OR WALL FOUNDATIONS AS STIPULATED IN THE <br />GEOTECHNICAL REPORT. ALL IRRIGATION DISTRIBUTION LINES, HEADS AND EMITTERS SHALL BE KEPT OUTSIDE THE <br />MINIMUM DISTANCE AWAY FROM ALL BUILDING AND WALL FOUNDATIONS AS STIPULATED IN THE GEOTECHNICAL REPORT. <br />2. LANDSCAPE MATERIAL LOCATIONS SHALL HAVE PRECEDENCE OF IRRIGATION MAINLINE AND LATERAL LOCATIONS. <br />COORDINATE INSTALLATION OP IRRIGATION EQUIPMENT SO THAT IT DOES NOT INTERFERE WITH THE PLANTING OF TREES <br />OR OTHER LANDSCAPE MATERIAL. <br />3. REFER TO IRRIGATION DRAWINGS FOR ADDITIONAL NOTES, REQUIREMENTS, AND DETAILS. <br />SECTION <br />('-)ROCK MULCH <br />NOT TO SCALE <br />HOLD TOP OF ROCK MULCH <br />i" MIN. BELOW ADJACENT WALL, TYP. <br />ROCK MULCH: 2 -4" RIVER ROCK <br />COLOR: MATCH ADJACENT DEVELOPMENT <br />FILTER FABRIC <br />COMPACTED SUBGRADE <br />O <br />U- <br />LU c <br />I <br />CI - <br />CC <br />Ua <br />LANDSCAPING NOTES AND DETAILS <br />