Laserfiche WebLink
Planning Commission <br />Meeting Minutes <br />November 10, 2022 <br />Page 3 of 13 <br />Case Planner: Ellie Hassan, Planner II <br />All notice was met as required and there is no commissioner conflict of interest. <br />Staff Presentation: <br />Hassan begins her presentation by sharing that the property is 4.57 acres and is <br />zoned for Planned Community commercial and residential. The site is bordered <br />by Hecla Way to the north, Blue Star Lane to the east, South Boulder Rd to the <br />south, and a commercial property to the west. It is located within the 73.8-acre <br />North End development, which was originally approved in December 2006 <br />through a Subdivision Plat, General Development Plan, and Planned Unit <br />Development. The property was part of Planning Area 1 in the GDP. It was <br />replatted in 2012 to create Block 11. <br />In 2017, the City approved a third GDP Amendment, final plat, and final PUD for <br />Block 11. The third GDP Amendment authorized 38 residential units in Planning <br />Area 1 and 40,000 square feet of commercial. The final plat for Block 11 <br />established utility and drainage easements on the property but did not create <br />separate lots. The Planned Unit Development proposed a mixed -use <br />neighborhood consistent with the densities proposed in the third GDP <br />amendment. <br />The Applicant is requesting a fourth GDP Amendment to accommodate changes <br />to permitted housing types. The maximum number of residential dwelling units <br />and commercial square footage will not change. The tables shown are for the <br />changes to the Land Use Area summary, which allocates all residential acreage <br />to multifamily residential and eliminates single family and townhome/duplex <br />housing types. The map of land uses in Planning Area 1 has been revised to <br />reflect multifamily residential only as well. The use is shown as a honeycomb <br />pattern on the map. <br />The applicant is requesting a replat to subdivide Block 11 into three lots. The <br />replat accommodates two multifamily lots and a single commercial development <br />lot. New access and utility easements are proposed that coincide with alleyways <br />proposed on the PUD Amendment. The existing easements were platted as part <br />of the 2017 subdivision plat. The applicant proposes the vacation of easements <br />that are no longer needed from the original plat, as shown in red. This will be <br />further evaluated at the City Council hearing. <br />The PUD Amendment proposes construction of 17 buildings, including 4 <br />commercial retail/office buildings on the southern half of the site towards South <br />Boulder Road and 13 residential multi -family buildings containing 38 dwelling <br />units on the northern half of the site. <br />The site layout is similar to the 2017 PUD Amendment and includes a north - <br />south private drive that connects South Boulder Road and Hecla Way. An east- <br />