My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Recreation Advisory Board Agenda and Packet 2023 02 27
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
RECREATION ADVISORY BOARD
>
2023 Recreation Advisory Board Agendas and Packets
>
Recreation Advisory Board Agenda and Packet 2023 02 27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2023 12:06:32 PM
Creation date
2/23/2023 11:46:58 AM
Metadata
Fields
Template:
City Council Records
Meeting Date
2/27/2023
Doc Type
Boards Commissions Committees Records
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
staffed, or the project duration was not accurately estimated. After the reasons have been <br />identified, document a process to resolve each within the quality assurance plan. While <br />writing the plan, determine which reasons will likely have the largest impacts on the <br />organization and determine a strategy to prioritize them. <br />5. Consolidate maintenance and capital renewal planning under the Lucity platform for major <br />assets across Parks. For specific operational needs, continue to support and integrate <br />workforce skills/training between major maintenance functions and operational functions. <br />6. Update the asset inventory within Lucity to include the integration of the water systems, <br />park assets, park infrastructure, and recurring maintenance plan. As the inventory <br />information develops, refinement of the data will occur. For example, area calculations of <br />the overall park area include the baseball/softball fields as they are generated through GIS. <br />A double counting exists of the square footage /acreage of the fields. These should be <br />subtracted from the overall park area. Additional park assets will require the cleaning of <br />Grounds <br />the data to ensure accurate data. <br />Create a plan to improve the effectiveness of updating asset and equipment records and <br />implement it. Be sure to track the process during implementation to help reach the goal of <br />developing a more effective process. <br />Identify desired service levels for grounds functions across Parks. Determine the level of <br />service expected for each park space type. This will ensure that visitors experience a similar <br />level of service across all City parks and will allow you to further refine your staffing needs. <br />Sustainability <br />9. Establish a sustainability policy on environmental sustainability that is aligned with the <br />Louisville Sustainability Action Plan. The policy should address sustainable product <br />purchasing, reduction and handling of waste, wise use and protection of land, air, water, <br />and wildlife, and sustainable design/construction of buildings. Include Parks natural <br />resource management plans and other areas of sustainability already implemented. Note: <br />CAPRA strives for a zero -waste plan. <br />10. Develop an implementation plan based on the Sustainability policy. <br />11. Review Parks Integrated Pest Management (IPM) strategy and on -going IPM operations, <br />balancing the labor-intensive work against community expectations. Continue to support <br />and revise Parks IPM program based on industry best practices. <br />12. Develop water conservation strategies based on CAPRA best management practices, <br />regional successful low impact development strategies, and appropriate planting palettes. <br />Resilience <br />13. Conduct Parks specific resilience planning that includes security, emergency preparedness <br />and continuity of operations. Once this planning process is in place and plans are <br />developed, there will be tactical operational items to consider such as routinely reviewing <br />these plans, conducting after action reports, and continual improvement in these areas. <br />Specific short-term recommendations that could be implemented prior to the planning <br />process include: <br />City of Louisville Parks Department January 16, 2023 <br />Summary of Findings Page 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.