Laserfiche WebLink
Sec. 15.04.010. Adoption. <br /> <br /> The International Building Code, 2003 Edition, published by the International Code <br />Council, 4051 West Flossmoor Road, Country Club Hills, Illinois, 60478-5795, is hereby <br />adopted by reference thereto and incorporated into and made a part of the city Code. The purpose <br />and subject matter of the International Building Code include regulating construction aspects of <br />building through comprehensive provisions and standards regulating the erection, construction, <br />enlargement, alteration, equipping, use, height, area, and maintenance of buildings and structures <br />and providing greater safety to the public by uniformity in building laws. Except as otherwise <br />provided in this chapter, the International Building Code is adopted in full, including the outline <br />of contents, index, and appendices as adopted herein and contained therein. Any reference to the <br />International Building Code within this chapter shall be to the 2003 Edition of such code. <br /> <br />Sec. 15.04.020. Amendments. <br /> <br /> The following amendments set forth in sections 15.04.030 through 15.04.110 are made to <br />the International Building Code. <br /> <br />Sec. 15.04.030. Appendices adopted. <br /> <br /> The following appendices of the International Building Code are hereby specifically <br />adopted; any appendices not listed are not adopted: Appendix C, Agricultural Buildings; <br />Appendix G, Flood-Resistant Construction; Appendix I, Patio Covers; Appendix J, Grading. <br /> <br />Sec. 15.04.040. Section 101.1 Title. <br /> <br /> Section 101.1 of the International Building Code is amended to insert "the City of <br />Louisville" so the section will read: <br /> <br />101.1 Title. These regulations shall be known as the Building Code of the City of Louisville, <br />hereinafter referred to as "this code." <br /> <br />Sec. 15.04.050. Section 108.2 Schedule of permit fees. <br /> <br /> Section 108.2 of the International Building Code shall read as follows: <br /> <br />108.2 Schedule of permit fees. On buildings, structures, electrical, gas, mechanical, and <br />plumbing systems or alterations requiring a permit, a fee for each permit shall be paid as <br />required, as set forth in Table 102.8.1 through 102.8.3 below: <br /> <br />Only one permit will be required for work to be done either on the initial construction or <br />subsequent alterations. The permit fee shall be computed using Table No. 102.8.1 of the <br />International Building Code except that the fee computed using Table No. 102.8.1 shall be <br /> <br />2 <br /> <br /> <br />