Laserfiche WebLink
Phase 1 <br />60% Design, ROW, <br />Utility Conflicts <br />2023 <br />CDOT/ARPA/DRCOG - $7)200,000 <br />City Match (Budgeted) - $800,000 <br />Xcel 1 % (Unallocated) - $1,500,000 <br />Total $9,500,000 <br />Power <br />Communications <br />} <br />Natural Ga's <br />Drainage <br />Qn\ni <br />