My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 2023 02 28 SP
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
2023 City Council Agendas and Packets
>
City Council Agenda and Packet 2023 02 28 SP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2024 3:14:14 PM
Creation date
3/8/2023 10:13:53 AM
Metadata
Fields
Template:
City Council Records
Meeting Date
2/28/2023
Doc Type
City Council Packet
Original Hardcopy Storage
9C6
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Old <br />a <br />K 70 <br />a <br />c <br />60 <br />0 <br />c 50 <br />U <br />c <br />E 40 <br />N <br />a 30 <br />044 <br />IN <br />H <br />. <br />. <br />IN <br />--I' <br />—ACP Curve-1 <br />—ACP Curve-2 <br />—ACP Curve - 3 <br />—ACP Curve -4 ,........... <br />ACP Curve-5 <br />................ <br />.. ... <br />... ... :.N. <br />.. ..:��.. <br />...... ................ <br />— <br />ACP Curve - 6 <br />-----PCC Curve <br />----- PCC Curve - 10 <br />----- PCC Curve - 11 <br />0 10 20 30 40 50 60 70 <br />Time (Years) <br />Figure 5 - Pavement Deterioration Curves <br />Rehabilitation Work Selections & History <br />Lucity uses a set of protocols that allow for activities to be assigned to PCI ranges based on filter criteria <br />that give the City the ability to create detailed rehabilitation strategy sets for each functional class and <br />pavement type according to the best practices determined for that pavement. <br />As planned rehabilitation work is completed a record of the work should be added to the pavement <br />management system. This ensures that conditions are up to date for future selections and creates a <br />repository of information to aid in planning. <br />Prioritization <br />Within Lucity the option is available to prioritize pavement projects for rehabilitation based on six main <br />criteria: PCI, Cost of Deferral, Pavement Strength, Pavement Type, Functional Class, and the Area of a <br />segment. Depending on the goals set forth at the beginning of the project these criteria can be weighted <br />differently based on their definition to create an overall priority factor for a project. Additional details <br />on these factors are available in section 4.2. <br />Project planning <br />The ability to plan work as needed allows the management program to better reflect the realities of a <br />paving program. Certain constraints may be applied to funds that require their use within a certain year <br />and activities relating to other assets may dictate the time and type of work to be performed. Lucity <br />allows for predefined projects to be entered into the management plan to account for work that is <br />IMS Pavement Management Report Louisville, CO 2022 Page 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.