My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 2023 02 28 SP
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
2023 City Council Agendas and Packets
>
City Council Agenda and Packet 2023 02 28 SP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2024 3:14:14 PM
Creation date
3/8/2023 10:13:53 AM
Metadata
Fields
Template:
City Council Records
Meeting Date
2/28/2023
Doc Type
City Council Packet
Original Hardcopy Storage
9C6
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4.4. Post Rehabilitation Condition <br />The following figure (Figure 16) compares the current network condition distribution (black) against the <br />projected 6-year post rehabilitation distribution at the $3.4M/Yr. (yellow) funding level and the <br />$2.78M/Yr (green) funding level. <br />50 <br />L 40 <br />T <br />m <br />Y <br />L <br />0 <br />3 30 <br />v <br />z <br />0 <br />a <br />to <br />c 20 <br />a <br />u <br />L <br />d <br />a <br />10 <br />7 <br />■ Current Network Average Condition = 73, Backlog = 2.1% <br />■ Client Budget: Annual Budget = $2784k/Yr - Final PCI = 73, Backlog = 5% <br />Recommended: Annual Budget = $3400k/Yr - Final PCI = 75, Backlog = 3% <br />Very Poor (0 to Poor (25 to 40) Marginal (40 to Fair (50 to 60) Good (60 to 70) Very Good (70 Excellent (85 to <br />25) 50) to 85) 100) <br />Pavement Condition Using Descriptive Terms <br />Figure 16 — 6-Year Post Rehabilitation Condition Distribution <br />4.5. Summary <br />This section reviewed the results of the 2022 pavement analysis models that were run in the Lucity <br />program. The recommended City budget of $3.4M/Yr will result in a 6-year post rehab PCI of 75 and a <br />backlog of approximately 3%. <br />IMS Pavement Management Report Louisville, CO 2022 Page 1 32 <br />