My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Open Space Advisory Board Agenda and Packet 2009 07 08
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
OPEN SPACE ADVISORY BOARD
>
2000-2019 Open Space Advisory Board Agendas and Packets
>
2009 Open Space Advisory Board Agendas and Packets
>
Open Space Advisory Board Agenda and Packet 2009 07 08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 8:21:21 AM
Creation date
8/20/2009 4:32:59 PM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
OSABPKT 2009 07 08
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />5. 104'" St Trail Segment Conneeting Coal Creek Trail with Rock Creek Trail <br />and Rock Creek Farm. The total trail length would be approximately two miles. <br />This trail would connect the <br />regional Coal Creek trail to <br />the Carolyn Holmberg <br />Preserve at Rock Creek <br />Farm as well as the Steams <br />Lake trail head. <br /> <br /> <br />'--.. <br /> <br />. H~~'Y 4~ r10 <br /> <br />, <br /> <br />~ <br /> <br />':"'~~Tra'rl <br />.' L.by~1te <br /> <br />I <br /> <br />; ,';;'-. ~;.:. ," <br /> <br />~ <br />I <br />~- <br /> <br />,..... <br />.- <br /> <br />- <br /> <br />- <br /> <br />~ <br /> <br />r <br /> <br />b <br />" <br /> <br />r <br /> <br />\. <br /> <br />.. "' <br /> <br />Statlls: Included in 2009 CIP as #7, Coal Creek/Rock Creek Spms. Parks and Open Space staff <br />will work with Lat1yette and Louis\'ille in 2009 to hire a consultant for planning/engineering. trail <br />work is scheduled in 2010-2011. <br /> <br />6. Davidson Mesa to Marshall Mesa Open Space: This proposal would connect <br />the existing trail system at Davidson Mesa Open Space (northwestern most trail <br />on the below map, north ofhwy 36) to the Boulder County Comprehensive Plan <br />and Boulder Valley Comprehensive Plan supported trail connections at <br />Community Ditch, Cowdrey Draw and Singletree trails. In the future the desired <br />connection could be accomplished with an overpass on Hwy 36 or a trail <br />connection from Davidson Mesa to the existing RTD park and ride overpass. <br /> <br /> <br />......................................... <br /> <br />Open Spece <br />- E.isling Tloil <br />fI1 bisling Trailhead <br /> <br />. Bo~;df;; 'C"o~'~;r"""""""""" <br />Comprehensive Pion <br />Significant <br />Riparian Corridor <br />'-"Conceptucl Trail <br />Canidar <br /> <br />O;jI~;.E~.;"s.ij~;j 'p;~'~~"" ". ........ <br />" - Proposed Trail <br />~ Proposed Trailhead <br /> <br />Statlls: TIus proposal is in aligrunent with the proposed US36 Bikeway wluch is included in the <br />COWIty'S Transp0l1ation CIP. COWIty Transp0l1ation staff recOlmnend it be studied and planned <br />as such. <br />
The URL can be used to link to this page
Your browser does not support the video tag.