Laserfiche WebLink
Modeled Tap Fe - <br />Utility 2023 <br />Water $1.7M <br />Wastewater $284k $199k $244k $148k $188k $170k:E $9k �$1.2M J <br />T -F T 1 <br />20 <br />24 <br />o.2M $1.6M $ o8M $ o7M $0.2M $11 3M <br />* includes tap fee projections for the Redtail Ridge Development in 2024-2026 <br />_ Cltynf <br />Louisville <br />