Laserfiche WebLink
Boulder County, CO <br />04016143 <br />3 of 9 <br />f./4 •••=. <br />I•1•••• MAIO <br />5QSFRUG <br />IJ <br />1--2 THIRD LEVEL FLOOR PLAN <br />A3,1 1" = ot-o" <br />•1==, ••=m, <br />TREET <br />11 <br />r <br />.71 <br />/25 FRONT ST <br />5 5R - 5 5ATH <br />125 FRONT ST B <br />5 5R - 5 BATH <br />125 FRONT ST - A <br />5 5R - 5ATH <br />• <br />IRM. =MN, <br />0 <br />0 <br />rrr <br />1 <br />0 <br />11 <br />0 <br />-11 <br />o <br />L <br />w w w w <br />SS <br />• D <br />ss <br />0< <br />cn <br />rn <br />I E <br />SS <br />0 <br />E <br />w - w <br />w <br />SPRUCE STREET <br />w -w <br />SS <br />- ss <br />r <br />2A 25 <br />2 I5R 2 BR <br />2.5 SATH 2.5 SATH <br />-- <br />SS <br />D <br />E <br />SS <br />- ss <br />ima <br />E <br />- D <br />- ss <br />SS <br />5C) SFRE STREET <br />2C <br />2 5R <br />2.5 SATH <br />(OR cot\ermERci <br />SECOND LEVEL FLOOR _PLAN <br />1" = <br />- SS <br />- <br />SS <br />2E <br />a 5 BR 2 5R <br />SATH .2.5 BATH <br />OR COMMRAL) <br />JIL <br />/25 FRONT ST - <br />BR - 5 BATH <br />725 FRONT ST 5 <br />5 5R - 5 BATH <br />125 FRONT ST - A <br />5 5R - 5 BATH <br />-E <br />• <br />FO <br />11111111Mminsinal <br />HARTRONFT <br />ASSOCIATES <br />A Professional Corporation <br />Planning <br />Architecture <br />Interior Design <br />950 Spruce Street, #2A <br />Louisville, CO 80027 <br />TEL: 303 . 673 . 9304 <br />FAX: 303 . 673 . 9319 <br />11.011111111111.1111111111.1.1 <br />ImP". <br />LLI <br />LL. S).1 <br />0 <br />crNi <br />-7tc- <br />1.1.1 z <br />LL <br />LLJ ir) <br />(1) <br />cr) <br />L11 <br />Lf) <br />L.r) <br />CY) <br />111111111111111111.11.1111111111 <br />44'5" COPYRIGHT 2021 <br />All drawn and written information <br />duplicated disclosed or otherwise <br />appearing herein shall not be used <br />w:h Eo :ut written consent of Hartronft <br />111111.11.11.11111111.111111.1111 <br />Associates, p.c. <br />iss <br />DPAUDTE-:SRU <br />DRAWN <br />RAvviv <br />HAPC <br />HREVcIEWED BY <br />Ap <br />• <br />PROJECT ft: <br />2054 <br />REVISIONS: <br />No. Description Date <br />1 REVISIONS 03.24.21 <br />2 HPC MEETING 04.15.21 <br />3 PC MEETING 05.10.21 <br />DRAWING T/TLE: <br />SECOND AND THIRD <br />FLOOR PLANS <br />