DIRECTOR OF COMMUNITY DEVELOPMENT CERTIFICATE
<br />APPROVED THIS (4til DAY OF 'G7 , 202-3 BY THE
<br />DIRECTOR OF COMMUNITY DEVELOPMENT THE CITY OF LOUISVILLE, COLORADO.
<br />BY:
<br />(DIRECTOR OF COMMUNI►1 NNING)
<br />A -
<br />OWNERSHIP SIGNATURE BLOCK
<br />413 S ARTHUR AVE PUD 2ND AMENDMENT
<br />LOT 12, BLOCK 1, COLORADO TECHNOLOGICAL CENTER FIRST FILING
<br />CASE #: PUD-000475-2023
<br />THE UNDERSIGNED AS THE OWNER OF THE LANDS DESCRIBED HEREIN, HEREBY AGREES ON
<br />BEHALF OF ITSELF, AND ITS HEIRS, SUCCESSORS AND ASSIGNS TO DEVELOP AND MAINTAIN THE
<br />PROPERTY DESCRIBED HEREON IN ACCORDANCE AND COMPLIANCE WITH THIS APPROVED PLAN
<br />AND THE LOUISVILLE MUNICIPAL CODE.
<br />(413 SOUTH ARTHUR, LLC)
<br />WITNESS MY HAND(S) AND SEAL(S) THIS DAY OF ©�r' 4) , 20-'0 .
<br />BY:
<br />(TOM ROBICHAUD, OWNER)
<br />STATE OF 614.400
<br />COUNTY OF _2--
<br />SIGNED BEFORE ME ONDr 4
<br />BY: TOM ROBICHAUD
<br />(NOTARY'S OFFICIAL SIGNATURE)
<br />Nokir/
<br />(TITLE OF OFFICE)
<br />-ai-aoa5
<br />(COMMISSION EXPIRATION)
<br />,201
<br />NOTARY STAMP
<br />.000FeL MOM
<br />M NNW
<br />�*
<br />WAN 0 asUSIM$
<br />I#414/0L
<br />TOTAL SITE AREA
<br />SITE COVERAGE
<br />BUILDING
<br />PARKING
<br />DRIVEWAY
<br />TOTAL:
<br />LANDSCAPE COVERAGE
<br />LANDSCAPE AREA
<br />HARDSCAPE AREA
<br />TOTAL:
<br />BUILDING HEIGHT
<br />1
<br />PROJECT
<br />LOCATION
<br />o
<br />EMPIRE RD ��------- .......
<br />/
<br />ARTHUR AVE
<br />CHERRY ST
<br />W DILLON RD
<br />VICINITY MAP
<br />1 " = 1,000'-0"
<br />REQUIRED
<br />75% MAX
<br />50,426 SF
<br />25% M I N
<br />16,809 SF
<br />EXISTING
<br />67,236
<br />57%
<br />38,425 SF
<br />11620
<br />11,334
<br />15,471
<br />38,425
<br />43%
<br />28,810 SF
<br />25,992
<br />2,818
<br />28,810
<br />PROPOSED
<br />67,235
<br />57%
<br />38,632.SF
<br />11,620
<br />11,062
<br />15,950
<br />38,632
<br />43%
<br />28,603 SF
<br />25,955
<br />2,648
<br />28,603
<br />ARCH. PROJECTIONS 50' MAX 38'-8" NO CHANGE
<br />PARAPET 40' MAX 28'-10" NO CHANGE
<br />SETBACKS
<br />NORTH 20' MIN 109'-4" NO CHANGE
<br />WEST 20' MIN 20'-3' NO CHANGE
<br />SOUTH 10' MIN 32'-3" NO CHANGE
<br />EAST 20' MIN 89'-11" NO CHANGE
<br />PARKING SPACES
<br />STANDARD 63 65
<br />ACCESSIBLE 3 4
<br />7% 0
<br />5 SPACES
<br />10% 0
<br />7 SPACES
<br />15% 0
<br />11 SPACES
<br />4 2
<br />20' MIN 20'-0"
<br />EV INSTALLED
<br />EV READY
<br />EV CAPABLE
<br />BICYCLE
<br />PARKING SETBACKS
<br />NORTH
<br />WEST
<br />SOUTH
<br />EAST
<br />04025428 10/18/2023 10:33 AM
<br />RF: $53.00 DF: $0.00 Page: 1 of 5
<br />Electronically recorded in Boulder County Colorado. Recorded as received.
<br />20' MIN 20'-0"
<br />10' MIN 10'-0"
<br />20' MIN 19'-11"
<br />63
<br />4
<br />0
<br />0
<br />0
<br />2
<br />NO CHANGE
<br />NO CHANGE
<br />NO CHANGE
<br />NO CHANGE 1
<br />BAY 1101AY1
<br />J
<br />tr..
<br />TAYLOR AVE
<br />BOXELDER ST
<br />A
<br />i
<br />9
<br />0 500 1000 2000
<br />NORTH
<br />PARKING CALCULATIONS
<br />REQUIRED PARKING RATIOS PER SEC. 2.2.1.L OF THE IDDSG:
<br />OFFICE (1/260)
<br />MANUFACTURING AND RESEARCH AND DEVELOPMENT (1/500)
<br />WAREHOUSE (1/1000)
<br />SHOWROOM SPACE (1/225)
<br />PROPOSED PARKING RATIOS PER SEC. 22.1.M FOR "FLEX" BUILDINGS
<br />OFFICE
<br />CONF
<br />BREAKROOM
<br />WAREHOUSE
<br />'ALL HANDS' MEETING
<br />STOR
<br />OFFICE
<br />TOTAL REQUIRED
<br />4,947/250
<br />264/250
<br />401/250
<br />3,270/1,000
<br />1,869/500
<br />209/1,000
<br />9.067/250
<br />19.8
<br />1.1
<br />1.6
<br />3.3
<br />3.7
<br />0.2
<br />36.3
<br />66.0 SPACES
<br />PROPOSED PARKING RATIO AVERAGE 3.12 SPACES/1,000 SF
<br />PROVIDED PARKING =
<br />4 ACCESSIBLE
<br />63 STANDARD
<br />67 SPACES
<br />PROVIDED PARKING RATIO AVERAGE 3.17 SPACES/1,000 SF
<br />PROPOSED RENOVATIONS TO THE EXTERIOR OF BUILDING ARE SUMMARIZED AS
<br />FOLLOWS:
<br />1. IMPROVE EXISTING ACCESSIBLE PARKING, BY MOVING IT CLOSER TO THE
<br />BUILDING ENTRY. THIS WILL INCLUDE PARTIAL RESTRIPING OF THE PARKING
<br />OF THE PARKING LOT AT THE FRONT OF THE BUILDING.
<br />2. ADD TWO OVERHEAD DOORS ON THE NORTH SIDE OF THE BUILDING (FACING
<br />THE INTERIOR PARKING LOT). THE OVERHEAD DOORS WILL BE ON -GRADE
<br />LOADING DOORS. THE OVERHEAD DOORS WILL BE AN ENLARGEMENT OF
<br />EXISTING WINDOW OPENINGS.
<br />3. ADD AN EGRESS DOOR WITH SIDELIGHT TO THE EAST SIDE OF THE BUILDING.
<br />THE DOOR & SIDELIGHT WILL REPLACE AN EXISTING WINDOW OPENING.
<br />4. ADD PEDESTRIAN LEVEL EXTERIOR LIGHTING AT THE NEW OVERHEAD DOORS
<br />AND EGRESS DOOR.
<br />5. ADD A NEW TRASH ENCLOSURE WITHIN THE SIDE -YARD NORTHERN PARKING
<br />LOT.
<br />1: AMENDMENT 1- 2007 - A 2-STORY 6,920 SF ADDITION TO THE
<br />WEST-NORTHWEST END OF THE ORIGINAL CONSTRUCTION, WHILE ALSO
<br />EXPANDING THE PARKING LOT. THE ADDITION AND PARKING EXPANSION
<br />WERE INCLUDED AS PHASED CONSTRUCTION WITHIN THE 'SOUNDS TRUE
<br />OFFICES AND DISTRIBUTION CENTER' FINAL PUD PLAN, SITE REVIEW, AND
<br />ARCHITECTURAL SITE PLAN, DATED 9 NOVEMBER 1995 AND RECORDED MAY
<br />16,1997.
<br />THE ENCLOSED AMENDMENT #2 PROPOSES TO MAKE MINOR REVISIONS TO
<br />THE APPROVED PUD AND AMENDMENT 1 AS DESCRIBED IN THE 'PROJECT
<br />DESCRIPTION" ON THIS SHEET.
<br />NO ADDITIONAL WAIVER REQUESTS ARE PROPOSED WITH THIS
<br />AMENDMENT
<br />i. THE PROPOSED REVISIONS ARE TO BE COMPLETED WITHIN A
<br />SINGLE PHASE OF CONSTRUCTION
<br />ii. THE CITY OF LOUISVILLE IS NOT RESPONSIBLE FOR DAMAGE TO,
<br />OR REPAIR OF, MONUMENT SIGNS, PAVEMENT SURFACES,
<br />OR LANDSCAPING CAUSED DURING REPAIR OR
<br />MAINTENANCE OF UTILITIES LOCATED WITHIN PUBLIC
<br />UTILITY EASEMENTS.
<br />ARCHITECT OF RECORD
<br />HAMPTON ARCHITECTURE
<br />201710TH STREET, SUITE B
<br />BOULDER, COLORADO 80302
<br />ETHAN HAMPTON, AlA
<br />720206.4122
<br />EMAIL ETHAN@2HAMPTON.COM
<br />NATHAN PILLATZKE, AlA
<br />720.938.9190
<br />EMAIL NATHAN02HAMPTON.COM
<br />PHOTOMETRICS
<br />ILLUMI NATION SYSTEMS
<br />5 SOUTH KALAMATH STREET
<br />DENVER, CO 80223
<br />KERI STORMS
<br />303295.2900
<br />KERLSTORMS@I LLUMSYS.COM
<br />SHEET INDEX
<br />1 COVER
<br />2 SITE PLAN
<br />3 BUILDING ELEVATIONS
<br />4 SITE AMENITIES & DETAILS
<br />6 PHOTOMETRIC PLAN
<br />ZONING - INDUSTRIAL ZONE
<br />PROPERTY OWNER
<br />PRECISION PLUMBING
<br />5035 CHAPARRAL COURT
<br />BOULDER, CO 80301
<br />TOM ROBICHAUD
<br />303.803.5119
<br />TOMOPRECISIONPLU MBING.COM
<br />DESIGN STANDARDS -
<br />INDUSTRIAL DEVELOPMENT DESIGN STANDARDS &
<br />GUIDELINES (IDDSG)
<br />REVISED: JANUARY 18, 2000
<br />SITE AREA:
<br />67,235 SF/ 1.54 ACRES
<br />BUILDING AREA:
<br />FIRST FLOOR
<br />SECOND FLOOR
<br />TOTAL- GFA
<br />11558SF
<br />9,580 SF
<br />21,138 SF
<br />2017 10th Street, Suite B
<br />Boulder, CO 80302
<br />720.206.4122
<br />c3)
<br />■r.
<br />E
<br />:c7)a
<br />V
<br />U)
<br />L
<br />a_
<br />413 South Arthur Avenue
<br />Louisville, CO 80027
<br />ISSUE/REVISION
<br />Lot 12, Block 1
<br />Hampton Architecture
<br />0
<br />CD co
<br />COo
<br />it °)
<br />CQ)
<br />O
<br />m.
<br />U O
<br />as Z'a
<br />o O
<br />..o U
<br />c as
<br />o
<br />1 Q
<br />co .46
<br />O
<br />U U
<br />DATE #
<br />PUD AMENDMENT
<br />08/04/23 1
<br />PUD AMENDMENT R1
<br />09/07/23 2
<br />PUD AMENDMENT R2
<br />10/04/23 3
<br />SHEET DESCRIPTION
<br />COVER
<br />SHEET NUMBER:
<br />10F5
<br />
|