Laserfiche WebLink
DIRECTOR OF COMMUNITY DEVELOPMENT CERTIFICATE <br />APPROVED THIS (4til DAY OF 'G7 , 202-3 BY THE <br />DIRECTOR OF COMMUNITY DEVELOPMENT THE CITY OF LOUISVILLE, COLORADO. <br />BY: <br />(DIRECTOR OF COMMUNI►1 NNING) <br />A - <br />OWNERSHIP SIGNATURE BLOCK <br />413 S ARTHUR AVE PUD 2ND AMENDMENT <br />LOT 12, BLOCK 1, COLORADO TECHNOLOGICAL CENTER FIRST FILING <br />CASE #: PUD-000475-2023 <br />THE UNDERSIGNED AS THE OWNER OF THE LANDS DESCRIBED HEREIN, HEREBY AGREES ON <br />BEHALF OF ITSELF, AND ITS HEIRS, SUCCESSORS AND ASSIGNS TO DEVELOP AND MAINTAIN THE <br />PROPERTY DESCRIBED HEREON IN ACCORDANCE AND COMPLIANCE WITH THIS APPROVED PLAN <br />AND THE LOUISVILLE MUNICIPAL CODE. <br />(413 SOUTH ARTHUR, LLC) <br />WITNESS MY HAND(S) AND SEAL(S) THIS DAY OF ©�r' 4) , 20-'0 . <br />BY: <br />(TOM ROBICHAUD, OWNER) <br />STATE OF 614.400 <br />COUNTY OF _2-- <br />SIGNED BEFORE ME ONDr 4 <br />BY: TOM ROBICHAUD <br />(NOTARY'S OFFICIAL SIGNATURE) <br />Nokir/ <br />(TITLE OF OFFICE) <br />-ai-aoa5 <br />(COMMISSION EXPIRATION) <br />,201 <br />NOTARY STAMP <br />.000FeL MOM <br />M NNW <br />�* <br />WAN 0 asUSIM$ <br />I#414/0L <br />TOTAL SITE AREA <br />SITE COVERAGE <br />BUILDING <br />PARKING <br />DRIVEWAY <br />TOTAL: <br />LANDSCAPE COVERAGE <br />LANDSCAPE AREA <br />HARDSCAPE AREA <br />TOTAL: <br />BUILDING HEIGHT <br />1 <br />PROJECT <br />LOCATION <br />o <br />EMPIRE RD ��------- ....... <br />/ <br />ARTHUR AVE <br />CHERRY ST <br />W DILLON RD <br />VICINITY MAP <br />1 " = 1,000'-0" <br />REQUIRED <br />75% MAX <br />50,426 SF <br />25% M I N <br />16,809 SF <br />EXISTING <br />67,236 <br />57% <br />38,425 SF <br />11620 <br />11,334 <br />15,471 <br />38,425 <br />43% <br />28,810 SF <br />25,992 <br />2,818 <br />28,810 <br />PROPOSED <br />67,235 <br />57% <br />38,632.SF <br />11,620 <br />11,062 <br />15,950 <br />38,632 <br />43% <br />28,603 SF <br />25,955 <br />2,648 <br />28,603 <br />ARCH. PROJECTIONS 50' MAX 38'-8" NO CHANGE <br />PARAPET 40' MAX 28'-10" NO CHANGE <br />SETBACKS <br />NORTH 20' MIN 109'-4" NO CHANGE <br />WEST 20' MIN 20'-3' NO CHANGE <br />SOUTH 10' MIN 32'-3" NO CHANGE <br />EAST 20' MIN 89'-11" NO CHANGE <br />PARKING SPACES <br />STANDARD 63 65 <br />ACCESSIBLE 3 4 <br />7% 0 <br />5 SPACES <br />10% 0 <br />7 SPACES <br />15% 0 <br />11 SPACES <br />4 2 <br />20' MIN 20'-0" <br />EV INSTALLED <br />EV READY <br />EV CAPABLE <br />BICYCLE <br />PARKING SETBACKS <br />NORTH <br />WEST <br />SOUTH <br />EAST <br />04025428 10/18/2023 10:33 AM <br />RF: $53.00 DF: $0.00 Page: 1 of 5 <br />Electronically recorded in Boulder County Colorado. Recorded as received. <br />20' MIN 20'-0" <br />10' MIN 10'-0" <br />20' MIN 19'-11" <br />63 <br />4 <br />0 <br />0 <br />0 <br />2 <br />NO CHANGE <br />NO CHANGE <br />NO CHANGE <br />NO CHANGE 1 <br />BAY 1101AY1 <br />J <br />tr.. <br />TAYLOR AVE <br />BOXELDER ST <br />A <br />i <br />9 <br />0 500 1000 2000 <br />NORTH <br />PARKING CALCULATIONS <br />REQUIRED PARKING RATIOS PER SEC. 2.2.1.L OF THE IDDSG: <br />OFFICE (1/260) <br />MANUFACTURING AND RESEARCH AND DEVELOPMENT (1/500) <br />WAREHOUSE (1/1000) <br />SHOWROOM SPACE (1/225) <br />PROPOSED PARKING RATIOS PER SEC. 22.1.M FOR "FLEX" BUILDINGS <br />OFFICE <br />CONF <br />BREAKROOM <br />WAREHOUSE <br />'ALL HANDS' MEETING <br />STOR <br />OFFICE <br />TOTAL REQUIRED <br />4,947/250 <br />264/250 <br />401/250 <br />3,270/1,000 <br />1,869/500 <br />209/1,000 <br />9.067/250 <br />19.8 <br />1.1 <br />1.6 <br />3.3 <br />3.7 <br />0.2 <br />36.3 <br />66.0 SPACES <br />PROPOSED PARKING RATIO AVERAGE 3.12 SPACES/1,000 SF <br />PROVIDED PARKING = <br />4 ACCESSIBLE <br />63 STANDARD <br />67 SPACES <br />PROVIDED PARKING RATIO AVERAGE 3.17 SPACES/1,000 SF <br />PROPOSED RENOVATIONS TO THE EXTERIOR OF BUILDING ARE SUMMARIZED AS <br />FOLLOWS: <br />1. IMPROVE EXISTING ACCESSIBLE PARKING, BY MOVING IT CLOSER TO THE <br />BUILDING ENTRY. THIS WILL INCLUDE PARTIAL RESTRIPING OF THE PARKING <br />OF THE PARKING LOT AT THE FRONT OF THE BUILDING. <br />2. ADD TWO OVERHEAD DOORS ON THE NORTH SIDE OF THE BUILDING (FACING <br />THE INTERIOR PARKING LOT). THE OVERHEAD DOORS WILL BE ON -GRADE <br />LOADING DOORS. THE OVERHEAD DOORS WILL BE AN ENLARGEMENT OF <br />EXISTING WINDOW OPENINGS. <br />3. ADD AN EGRESS DOOR WITH SIDELIGHT TO THE EAST SIDE OF THE BUILDING. <br />THE DOOR & SIDELIGHT WILL REPLACE AN EXISTING WINDOW OPENING. <br />4. ADD PEDESTRIAN LEVEL EXTERIOR LIGHTING AT THE NEW OVERHEAD DOORS <br />AND EGRESS DOOR. <br />5. ADD A NEW TRASH ENCLOSURE WITHIN THE SIDE -YARD NORTHERN PARKING <br />LOT. <br />1: AMENDMENT 1- 2007 - A 2-STORY 6,920 SF ADDITION TO THE <br />WEST-NORTHWEST END OF THE ORIGINAL CONSTRUCTION, WHILE ALSO <br />EXPANDING THE PARKING LOT. THE ADDITION AND PARKING EXPANSION <br />WERE INCLUDED AS PHASED CONSTRUCTION WITHIN THE 'SOUNDS TRUE <br />OFFICES AND DISTRIBUTION CENTER' FINAL PUD PLAN, SITE REVIEW, AND <br />ARCHITECTURAL SITE PLAN, DATED 9 NOVEMBER 1995 AND RECORDED MAY <br />16,1997. <br />THE ENCLOSED AMENDMENT #2 PROPOSES TO MAKE MINOR REVISIONS TO <br />THE APPROVED PUD AND AMENDMENT 1 AS DESCRIBED IN THE 'PROJECT <br />DESCRIPTION" ON THIS SHEET. <br />NO ADDITIONAL WAIVER REQUESTS ARE PROPOSED WITH THIS <br />AMENDMENT <br />i. THE PROPOSED REVISIONS ARE TO BE COMPLETED WITHIN A <br />SINGLE PHASE OF CONSTRUCTION <br />ii. THE CITY OF LOUISVILLE IS NOT RESPONSIBLE FOR DAMAGE TO, <br />OR REPAIR OF, MONUMENT SIGNS, PAVEMENT SURFACES, <br />OR LANDSCAPING CAUSED DURING REPAIR OR <br />MAINTENANCE OF UTILITIES LOCATED WITHIN PUBLIC <br />UTILITY EASEMENTS. <br />ARCHITECT OF RECORD <br />HAMPTON ARCHITECTURE <br />201710TH STREET, SUITE B <br />BOULDER, COLORADO 80302 <br />ETHAN HAMPTON, AlA <br />720206.4122 <br />EMAIL ETHAN@2HAMPTON.COM <br />NATHAN PILLATZKE, AlA <br />720.938.9190 <br />EMAIL NATHAN02HAMPTON.COM <br />PHOTOMETRICS <br />ILLUMI NATION SYSTEMS <br />5 SOUTH KALAMATH STREET <br />DENVER, CO 80223 <br />KERI STORMS <br />303295.2900 <br />KERLSTORMS@I LLUMSYS.COM <br />SHEET INDEX <br />1 COVER <br />2 SITE PLAN <br />3 BUILDING ELEVATIONS <br />4 SITE AMENITIES & DETAILS <br />6 PHOTOMETRIC PLAN <br />ZONING - INDUSTRIAL ZONE <br />PROPERTY OWNER <br />PRECISION PLUMBING <br />5035 CHAPARRAL COURT <br />BOULDER, CO 80301 <br />TOM ROBICHAUD <br />303.803.5119 <br />TOMOPRECISIONPLU MBING.COM <br />DESIGN STANDARDS - <br />INDUSTRIAL DEVELOPMENT DESIGN STANDARDS & <br />GUIDELINES (IDDSG) <br />REVISED: JANUARY 18, 2000 <br />SITE AREA: <br />67,235 SF/ 1.54 ACRES <br />BUILDING AREA: <br />FIRST FLOOR <br />SECOND FLOOR <br />TOTAL- GFA <br />11558SF <br />9,580 SF <br />21,138 SF <br />2017 10th Street, Suite B <br />Boulder, CO 80302 <br />720.206.4122 <br />c3) <br />■r. <br />E <br />:c7)a <br />V <br />U) <br />L <br />a_ <br />413 South Arthur Avenue <br />Louisville, CO 80027 <br />ISSUE/REVISION <br />Lot 12, Block 1 <br />Hampton Architecture <br />0 <br />CD co <br />COo <br />it °) <br />CQ) <br />O <br />m. <br />U O <br />as Z'a <br />o O <br />..o U <br />c as <br />o <br />1 Q <br />co .46 <br />O <br />U U <br />DATE # <br />PUD AMENDMENT <br />08/04/23 1 <br />PUD AMENDMENT R1 <br />09/07/23 2 <br />PUD AMENDMENT R2 <br />10/04/23 3 <br />SHEET DESCRIPTION <br />COVER <br />SHEET NUMBER: <br />10F5 <br />