Laserfiche WebLink
SIGNATURE BLOCKS <br />DIRECTOR OF COMMUNITY DEVELOPMENT CERTIFICATE <br />APPROVED THIS Kh DAY OF -G f , 202-3 BY THE <br />DIRECTOR OF COMMUNITY DEVELOPMENT THE CITY OF LOUISVILLE, COLORADO. <br />BY:�'/- <br />t� <br />(DIRECTOR OF COMMUNI <br />NNING) <br />OWNERSHIP SIGNATURE BLOCK <br />413 S ARTHUR AVE PUD 2ND AMENDMENT <br />LOT 12, BLOCK 1, COLORADO TECHNOLOGICAL CENTER FIRST FILING <br />CASE #: PUD-000475-2023 <br />THE UNDERSIGNED AS THE OWNER OF THE LANDS DESCRIBED HEREIN, HEREBY AGREES ON <br />BEHALF OF ITSELF, AND ITS HEIRS, SUCCESSORS AND ASSIGNS TO DEVELOP AND MAINTAIN THE <br />PROPERTY DESCRIBED HEREON IN ACCORDANCE AND COMPLIANCE WITH THIS APPROVED PLAN <br />AND THE LOUISVILLE MUNICIPAL CODE. <br />(413 SOUTH ARTHUR, LLC) <br />WITNESS MY HAND(S) AND SEAL(S) THIS <br />BY: <br />(TOM ROBICHAUD, OWNER) <br />STATE OF deS 00 <br />COUNTY OF / -- <br />SIGNED BEFORE ME ON <br />BY: TOM ROBICHAUD <br />(NOTARY'S OFFICIAL SIGNATURE) <br />/\)o4c4r <br />(TITLE OF OFFICE) <br />U <br />b <br />(COMMISSION EXPIRATION) <br />C. <br />AYOF `C),0 ,20 E . <br />,20 3 <br />NOTARY STAMP <br />JENN IFER MOM <br />NOTARY PUBLIC <br />WON 0 <br />021.010 <br />CIMISOM <br />J <br />IDDSG <br />TOTAL SITE AREA <br />SITE COVERAGE <br />BUILDING <br />PARKING <br />DRIVEWAY <br />TOTAL: <br />LANDSCAPE COVERAGE <br />LANDSCAPE AREA <br />HARDSCAPE AREA <br />TOTAL: <br />BUILDING HEIGHT <br />ARCH. PROJECTIONS <br />SETBACKS <br />PROJECT <br />LOCATION <br />VICINITY MAP <br />1" = 1,000'-0" <br />SITE DATA TABLE <br />REQUIRED <br />75% MAX <br />50,426 SF <br />25% MIN <br />16,809 SF <br />50' MAX <br />PARAPET 40' MAX <br />NORTH 20' MIN <br />WEST 20' MIN <br />SOUTH 10' MIN <br />EAST 20' MIN <br />I PARKING SPACES <br />STANDARD <br />ACCESSIBLE <br />EV INSTALLED <br />EV READY <br />EV CAPABLE <br />BICYCLE <br />PARKING SETBACKS <br />NORTH <br />WEST <br />SOUTH <br />EAST <br />63 <br />3 <br />7% <br />5 SPACES <br />10% <br />7 SPACES <br />15% <br />11 SPACES <br />4 <br />20' MIN <br />20' MIN <br />10' MIN <br />20' MIN <br />EXISTING <br />67,235 <br />57% <br />38,425 SF <br />11620 <br />11,334 <br />15,471 <br />38,425 <br />43% <br />28,810 SF <br />25,992 <br />2,818 <br />28,810 <br />EMPIRE RD,.. -------------- <br />ARTHUR <br />AVE <br />CHERRY ST <br />W DILLON RD <br />PROPOSED <br />67,235 <br />57% <br />38,632 SF <br />11,620 <br />11,062 <br />15,950 <br />38,632 <br />43% <br />28,603 SF <br />25,955 <br />2,648 <br />28,603 <br />38'-8" NO CHANGE <br />28'-10" NO CHANGE <br />109'-4" <br />20'-3" <br />32'-3" <br />89'-11 " <br />65 <br />4 <br />0 <br />0 <br />0 <br />2 <br />20'-0" <br />20'-0" <br />101-0" <br />19'-11" <br />NO CHANGE <br />NO CHANGE <br />NO CHANGE <br />NO CHANGE <br />63 <br />4 <br />0 <br />0 <br />0 <br />2 <br />NO CHANGE <br />NO CHANGE <br />NO CHANGE <br />NO CHANGE <br />-o <br />m <br />m <br />J <br />3AV )iO1AVl <br />500 ft` <br />TAYLOR AVE <br />PRAIRIE WAY <br />BOXELDER ST <br />0 <br />i‘ <br />m 0I co <br />-9 o <br />0 500 1000 2000 <br />NORTH <br />PARKING CALCULATIONS <br />REQUIRED PARKING RATIOS PER SEC. 2.2.1.L OF THE IDDSG: <br />OFFICE (1 /250) <br />MANUFACTURING AND RESEARCH AND DEVELOPMENT (1/500) <br />WAREHOUSE (1/1000) <br />SHOWROOM SPACE (1/225) <br />PROPOSED PARKING RATIOS PER SEC. 2.2.1.M FOR "FLEX" BUILDINGS <br />OFFICE <br />CONF <br />BREAKROOM <br />WAREHOUSE <br />"ALL HANDS" MEETING <br />STOR <br />OFFICE <br />TOTAL REQUIRED <br />4,947/250 <br />264/250 <br />401/250 <br />3,270/1,000 <br />1,869/500 <br />209/1,000 <br />9,067/250 <br />19.8 <br />1.1 <br />1.6 <br />3.3 <br />3.7 <br />0.2 <br />36.3 <br />66.0 SPACES <br />PROPOSED PARKING RATIO AVERAGE 3.12 SPACES/1,000 SF <br />PROVIDED PARKING = <br />4 ACCESSIBLE <br />63 STANDARD <br />67 SPACES <br />PROVIDED PARKING RATIO AVERAGE 3.17 SPACES/1,000 SF <br />PROJECT DESCRIPTION <br />PROPOSED RENOVATIONS TO THE EXTERIOR OF BUILDING ARE SUMMARIZED AS <br />FOLLOWS: <br />1. IMPROVE EXISTING ACCESSIBLE PARKING, BY MOVING IT CLOSER TO THE <br />BUILDING ENTRY. THIS WILL INCLUDE PARTIAL RESTRIPING OF THE PARKING <br />OF THE PARKING LOT AT THE FRONT OF THE BUILDING. <br />2. ADD TWO OVERHEAD DOORS ON THE NORTH SIDE OF THE BUILDING (FACING <br />THE INTERIOR PARKING LOT). THE OVERHEAD DOORS WILL BE ON -GRADE <br />LOADING DOORS. THE OVERHEAD DOORS WILL BE AN ENLARGEMENT OF <br />EXISTING WINDOW OPENINGS. <br />3. ADD AN EGRESS DOOR WITH SIDELIGHT TO THE EAST SIDE OF THE BUILDING. <br />THE DOOR & SIDELIGHT WILL REPLACE AN EXISTING WINDOW OPENING. <br />4. ADD PEDESTRIAN LEVEL EXTERIOR LIGHTING AT THE NEW OVERHEAD DOORS <br />AND EGRESS DOOR. <br />5. ADD A NEW TRASH ENCLOSURE WITHIN THE SIDE -YARD NORTHERN PARKING <br />LOT. <br />PREVIOUS AMENDMENTS <br />1. AMENDMENT 1 - 2007 - A 2-STORY 6,920 SF ADDITION TO THE <br />WEST-NORTHWEST END OF THE ORIGINAL CONSTRUCTION, WHILE ALSO <br />EXPANDING THE PARKING LOT. THE ADDITION AND PARKING EXPANSION <br />WERE INCLUDED AS PHASED CONSTRUCTION WITHIN THE "SOUNDS TRUE <br />OFFICES AND DISTRIBUTION CENTER" FINAL PUD PLAN, SITE REVIEW, AND <br />ARCHITECTURAL SITE PLAN, DATED 9 NOVEMBER 1995 AND RECORDED MAY <br />15,1997. <br />THE ENCLOSED AMENDMENT #2 PROPOSES TO MAKE MINOR REVISIONS TO <br />THE APPROVED PUD AND AMENDMENT 1 AS DESCRIBED IN THE "PROJECT <br />DESCRIPTION" ON THIS SHEET. <br />WAIVER REQUEST <br />NO ADDITIONAL WAIVER REQUESTS ARE PROPOSED WITH THIS <br />AMENDMENT <br />GENERAL NOTES <br />i. THE PROPOSED REVISIONS ARE TO BE COMPLETED WITHIN A <br />SINGLE PHASE OF CONSTRUCTION <br />ii. THE CITY OF LOUISVILLE IS NOT RESPONSIBLE FOR DAMAGE TO, <br />OR REPAIR OF, MONUMENT SIGNS, PAVEMENT SURFACES, <br />OR LANDSCAPING CAUSED DURING REPAIR OR <br />MAINTENANCE OF UTILITIES LOCATED WITHIN PUBLIC <br />UTILITY EASEMENTS. <br />PROJECT TEAM <br />ARCHITECT OF RECORD <br />HAMPTON ARCHITECTURE <br />2017 10TH STREET, SUITE B <br />BOULDER, COLORADO 80302 <br />ETHAN HAMPTON, AIA <br />720.206.4122 <br />EMAIL: ETHAN@2HAMPTON.COM <br />NATHAN PILLATZKE, AIA <br />720.938.9190 <br />EMAIL: NATHAN@2HAMPTON.COM <br />PHOTOMETRICS <br />ILLUMINATION SYSTEMS <br />5 SOUTH KALAMATH STREET <br />DENVER, CO 80223 <br />KERI STORMS <br />303.295.2900 <br />KERISTORMS@I LLUMSYS.COM <br />PROPERTY OWNER <br />PRECISION PLUMBING <br />5035 CHAPARRAL COURT <br />BOULDER, CO 80301 <br />TOM ROBICHAUD <br />303.803.5119 <br />TOM@PRECISIONPLUMBING.COM <br />SHEET INDEX <br />SHEET INDEX <br />1 COVER <br />2 SITE PLAN <br />3 BUILDING ELEVATIONS <br />4 SITE AMENITIES & DETAILS <br />5 PHOTOMETRIC PLAN <br />PROJECT CONTEXT <br />ZONING - INDUSTRIAL ZONE <br />DESIGN STANDARDS - <br />INDUSTRIAL DEVELOPMENT DESIGN STANDARDS & <br />GUIDELINES (IDDSG) <br />REVISED: JANUARY 18, 2000 <br />SITE AREA: <br />67,235 SF/ 1.54 ACRES <br />BUILDING AREA: <br />FIRST FLOOR <br />SECOND FLOOR <br />TOTAL - GFA <br />11558 SF <br />9,580 SF <br />21,138 SF <br />2017 10th Street, Suite B <br />Boulder, CO 80302 <br />720.206.4122 <br />C <br />■ <br />xi) <br />E <br />C <br />.o <br />U♦ <br />W <br />413 South Arthur Avenue <br />N <br />0 <br />00 <br />0 <br />0 <br />ai <br />cn <br />0 <br />J <br />T <br />0 <br />03 <br />N <br />T <br />0 <br />J <br />Hampton Architecture <br />• O <br />U <br />c <br />LL a) <br />c co <br />U o <br />CU r <br />U <br />01 0 <br />O <br />o U <br />c <br />0 ▪ •> <br />I— •5 <br />-aa <br />a O <br />o 4' <br />U <br />ISSUE/REVISION <br />DATE # <br />PUD AMENDMENT <br />08/04/23 1 <br />PUD AMENDMENT R1 <br />09/07/23 2 <br />PUD AMENDMENT R2 <br />10/04/23 3 <br />SHEET DESCRIPTION <br />COVER <br />SHEET NUMBER: <br />10F5 <br />