My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Economic Vitality Committee Agenda and Packet 2023 10 27
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
ECONOMIC VITALITY COMMITTEE
>
2023 Economic Vitality Committee Agendas and Packets
>
Economic Vitality Committee Agenda and Packet 2023 10 27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2023 9:45:39 AM
Creation date
11/22/2023 9:43:21 AM
Metadata
Fields
Template:
City Council Records
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SUBJECT: STAFF UPDATES <br />DATE: OCTOBER 27, 2023 PAGE 2 OF 3 <br />• Nonresidential building additions equal to 25% or more of existing building SF <br />requires sitewide compliance (with existing parking lot pole exemption) <br />The proposed ordinance was denied following a 3-3 vote. <br />Energy Code Update <br />Staff has compiled comments received during the August Open House for the <br />commercial energy code and is in the process of preparing amendments to the code. <br />Staff hopes to present the proposed amendments to City Council this year, but it's <br />possible that this project will be delayed until early 2024 due to current staffing capacity. <br />Downtown Vision Plan <br />A Project Kickoff for the Downtown Vision Plan for Streetscapes and Public Spaces is <br />scheduled for September 26. Staff anticipates that a project schedule will be available <br />soon. <br />LRC Update <br />The LRC approved an amendment to its 2023 Budget during its October meeting. The <br />proposed 2024 LRC Budget will go to City Council on November 6. The 2024 Budget <br />will need to return to the LRC for final adoption following Council approval. <br />The LRC held a joint meeting with the DBA on October 6. The Revitalization <br />Commission identified a joint meeting with the DBA as a priority in its 2023 Work Plan. <br />Topics discussed during the meeting included vacant properties within the Urban <br />Renewal Area, the new Property Improvement Program, exploring the closure of Main <br />Street, and upgrades to Steinbaugh Pavilion. <br />Staff is in the process of preparing program criteria for the new Property Improvement <br />Program, which would extend Fagade Improvement Program funding beyond work to <br />exterior facades to the entire building/property. Examples of additional projects that may <br />be considered for grant funding include entire building exterior renovations, back of <br />building and alleyway improvements, trash enclosures, internal building modifications <br />and upgrades/replacement of core systems (HVAC, electrical, plumbing), incorporation <br />of murals and/or public art on private property, resiliency improvements (i.e., natural <br />disaster mitigation improvements), landscaping, etc. <br />EVC Work Plan <br />The 2023 EVC Work Plan is included as Attachment #1. This attachment includes the <br />most recent comments that were presented during the September EVC meeting. <br />Staff will continue to update the 2023 Work Plan as needed. <br />ATTACHMENT(S): <br />1. 2023 EVC Work Plan <br />Agenda Packet P. 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.