Laserfiche WebLink
Exhibit A <br />Description <br />Total Cost <br />Structural and <br />foundation work <br />items <br />$21,400 <br />Sewer replacement <br />$6,000 <br />Front porch deck <br />flooring <br />$3,521 <br />Termite mitigation <br />$1,195 <br />Rebuild back deck <br />$750.31 <br />Regrade to direct <br />surface water away <br />from foundation <br />$198.99 <br />Total Cost <br />$33,065.30 <br />Total Requested <br />$16,532.65 <br />Total Granted <br />$16,532.65 <br />W. <br />