Laserfiche WebLink
Scope of Services and Fee Proposal <br />No. Work Item Personnel <br />A. Bose Mop Preparation <br />A base map with topographic Information, Kasprzak <br />legal boundary, and structure locations wdI be <br />graphically presented by DHM Design. City of <br />Lousiville to provide topographic CADD file <br />with 2' contour information and existing as- <br />bunts of the site. <br />B. Site Inventory and Analysis <br />A site inventory will be prepared to record Kasprzak <br />existing features. A site analysis will be <br />prepared to identity design opportunities and <br />constraints such as view, site lines, drainage. <br />traffic pattems, etc. (Products: Site Inventory <br />and Analysis Plan) <br />A. Master Pion Drawings <br />DHM will develop a Landscape Master Plan <br />for North Louisville Water Treatment Plant <br />and a Site Design Landscape Improvement <br />Manual. DHM will coordinate with City Staff, <br />public utility agencies. citizen advisory groups. <br />as need. Areas of focus will include a <br />minimum of the following: project identification <br />signage, building Identification signage. <br />Parking lot landscape. building perimeter <br />landscape, visitor staging area, <br />pedestnanlbike trail identification and image. <br />and view comoor issues. (Products: Final <br />Landscape Master Plan with sketches of <br />typical proposed improvements, and Site <br />Design and Landscape Improvement <br />Manual (appioz. 4 sheets). Rendered <br />boards provided to the North Lou bvllle <br />Water Treatment Plant personnel). <br />B. Review Meetings <br />Total of 2 review meetings with Louisville City <br />Staff, North Louisville Water Treatment Staff. <br />and Neighborhood Advisory Groups. <br />(Products: Meeting Notes) <br />Brown <br />Kasprzak <br />Shuck <br />Dreisen <br />McCarty <br />Brown <br />Kasprzak <br />Title Rate <br />Project Manager <br />Project Manager <br />Pnncipal <br />Project Manager <br />Landscape Architect <br />Irrigation Consultant <br />Clerical <br />Principal <br />Project Manager <br />355 <br />Hours Total <br />3 <br />5165 <br />$55 10 3550 <br />590 <br />355 <br />S46 <br />S50 <br />535 <br />Labor Total <br />15165 <br />2 5180 <br />50 52.750 <br />25 St.150 <br />2 3100 <br />8 3280 <br />154,460 1 <br />590 4 3360 <br />355 8 $440 <br />!ssoo <br />Iss.s75 I <br />