My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Commission Minutes 2009 08 13
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
PLANNING COMMISSION
>
2000-2019 Planning Commission
>
2009 Planning Commission Agendas Packets Minutes
>
Planning Commission Minutes 2009 08 13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 9:55:19 AM
Creation date
11/19/2009 1:06:19 PM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
PCMIN 2009 08 13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Planning Commission <br />Meeting Minutes <br />AUGUST 13, 2009 <br />Page 3 of 9 <br />The requested building height is 34’4”. The bulk of the building <br /> <br />o <br />will remain at 24’8”. A small portion of the southeastern addition <br />and a street facing parapet are the two (2) elements that exceed <br />34 feet. <br />Parking: <br /> <br /> <br />The internal circulation of the site will remain the same. <br /> <br />o <br />The parking demand on training days will require additional <br /> <br />o <br />parking, approximately 21 spaces. Staff recommends the fire <br />department seek an off site parking agreement with a nearby <br />neighbor. <br />Signs: <br /> <br /> <br />A wall sign over each bay has been proposed. <br /> <br />o <br />A Metro Fire Logo is proposed for the parapet. <br /> <br />o <br />Lighting: <br /> <br /> <br />Downcast accent lighting is proposed on the main structure. <br /> <br />o <br />A cut sheet has been included in the meeting packet. <br /> <br />o <br />Waivers Requested: <br /> <br /> <br />Building Height: The building elements over 27 feet, the front <br /> <br />o <br />parapet and the southeast addition. Neither exceeds 35 feet in <br />height. <br />Roof Slope: The roof design is predominantly flat with some <br /> <br />o <br />elements designed with 9:12 and 6:12 roof pitch. <br />Lot coverage: The FAR allowance for the lot is 7,835 SF or <br /> <br />o <br />35%. The proposed FAR is 13,512 SF or 60%. <br />Street Side Yard Setback: The proposed structure encroaches <br /> <br />o <br />into the 15 foot street side yard setback requirement, which is <br />adjacent to Lafayette Street. The encroachment is 3’7”. <br />Staff continued with a review of the five (5) Special Review Use Criteria, LMC <br />17.40.100.A. Staff acknowledged all five criterions had been met. <br />Staff recommends approval of Resolution No. 07, Series 2009 with the following <br />three conditions: <br />1. Staff recommends the fire department seek an off site parking <br />agreement with a nearby neighbor, possibly the karate studio to the <br />north, to secure additional parking for high traffic events. <br />2. The applicant shall address all concerns of the Public Works <br />Department, as detailed in the August 3, 2009 memo by Craig Duffin. <br />3. With the exception of the large mature trees on the north side of the <br />building, the applicant shall try and maintain all existing landscaping <br />improvements. <br />Commission Questions: <br />Loo had questions regarding: additional windows, signage, parking and the <br />requested waivers. <br />McCartney stated the windows could not be added because of the interior layout. <br />The signage will be located on the building. He pointed on the display board the <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.