Laserfiche WebLink
STEEL DOOR FRAME: <br />2"x2"xl/4" ANGLES WITH <br />2"xI/4" PLATE DIAGONAL <br />BRACES <br />I6'-0" <br />8'-0" <br />3'-4" 3'-4" <br />PRE -CAST GONG. HALL <br />PANEL - MATCH BUILDING- �_ <br />STEEL SWING BAR LATCH <br />2x4 STEEL TUBE (BOLT <br />TO 8" CONCRETE BLOCK) <br />-1/8"cPx3" STEEL SLEEVE <br />WELDED TO DOOR FRAME <br />5/8"cl) STEEL 'HINGE' PIN <br />WELDED TO CHANNEL <br />VERTICAL METAL ROOF <br />DECKING -PAINT TO <br />MATCH BUILDING <br />SLOPE CONCRETE FOR <br />DRAINAGE -TYPICAL <br />i/9. <br />% <br />\\ <br />i,ij <br />'/ <br />r <br />\' <br />O <br />\\ <br />, <br />/, <br />\\ <br />,/ <br />i, <br />% <br />\\ <br />J <br />\\ <br />)1' <br />// <br />% <br />/ <br />7'-8 <br />8'-0" <br />i <br />0 <br />FRONT ELEVATION <br />SCALE: 1/4" - l'-0" <br />PRE -CAST <br />CONC. WALL <br />RECYCLE BINS <br />4" CONCRETE SLAB -\ <br />82" WIDE 15" DEEP <br />DUMPS E N.I.G.) <br />-1'-8" WIDE GATE - <br />SEE ELEVATION <br />8'-0" <br />/'/ <br />16'-O" <br />w <br />O <br />0 <br />I/5" / FOOT <br />3'-4" <br />3'-4" <br />FLAN <br />SCALE: 1/4" - I'-O" <br />TRASH ENCLOSURE <br />i3) DETAILS <br />SC -ALE: <br />1'-4" <br />P. <br />1/4" = <br />2"c1) STEEL PIPE - SET <br />ENDS IN NON -SHRINK <br />GROUT (PAINT TO MATCH <br />WINDOW FRAMES) <br />4" CONCRETE <br />SLAB <br />BIKE RACK DETAIL / <br />PAINTED SITE GAST <br />CONCRETE PANEL <br />2" REVEAL <br />LETTERING BY <br />TENANT <br />COLOR 'B' <br />2" SILL <br />GRADE <br />1/2" = 1'-0" <br />/ COLOR 'A' <br />XYZ CORPORATION <br />39 SOUTH 104TH STREET <br />COLORADO TECHNOLOGICAL CENTER <br />N <br />GROUND SPOTLIGHT <br />AT SIGN <br />NOTE : MONUMENT SIGN TO <br />COMPLY WITH THE GDDSG <br />(=IL w <br />STONE VENEER <br />SIGN DETAIL <br />PRE -CAST CONC. <br />WALL PANEL - <br />MATCH BUILDING <br />IO'-0" <br />• <br />O <br />SIDE ELEVATION <br />SCALE: 1/4" - I'-O" <br />11 1 1 <br />11 <br />II <br />11 <br />11 — <br />I I <br />I11 <br />11 <br />11� <br />11 <br />III <br />III <br />I8'-2 <br />1 <br />PR <br />11 <br />fl <br />1I <br />I 1 <br />I 1 <br />I <br />I <br />I <br />100't3 II/2\ <br />5- '-a" 11 I <br />E. CONCRETE 1 <br />P STRUCTUR1E 1 <br />INFIP 7 U 1 <br />./,'Illfi'lq't it <br />n iteltt- ...y, 1 <br />/ <br />30' DRAINAGE AND UTILL <br />• <br />20 <br />PHASE 2 PARKIN' <br />(3.O PER - F OOO <br />-1---1---I-/�-T-I-T <br />L <br />1 1 1 I''' .' 1 RE EyE TT 1 <br />BIKE RACK <br />TYFr 1--UK Tb / <br />PROPOSED SETBACKS <br />BUILDING ONE: <br />FRONT (104TH <br />REAR: <br />SIDE (NORTH) : <br />SIDE (SOUTH - <br />STREET) : 164'± <br />240'± <br />50�± <br />DILLON RD): 116'± <br />BUILDING TWO: <br />FRONT (104TH <br />REAR: <br />SIDE (NORTH) : <br />SIDE (SOUTH - <br />STREET) : <br />DILLON RD): <br />PARKING: <br />31q1± FRONT (GTG BOULEVARD): <br />± REAR: <br />411'± SIDE (NORTH): <br />116± SIDE (SOUTH - DILLON RD): <br />q2'± <br />II'± <br />41'± <br />82'± <br />/ 6.5' WALK <br />i <br />•• / <br />-T�•I-T-I--T-I-T-I-/( -T-I-T-I--T-I-T——T—I- <br />1 /1/ 1 I I I I I I I/ I I I I I I I I I/t1 1 1 <br />1/ 1 PIliApiE 1kWCk 1 1 1/ /1 1 1 1 ., / 1 1 I <br />1 1- 1 1 1 1 J_ 1 J 1 1 L 1 <br />L O T 7 2 UNDERGROUND ROOF <br />(328, 7 22 S. F/./ / DRAIN CONNECTIONS <br />I I I Nor tokol-RE �IYIL <br />I 7. 1 3 1 A �) <br />�.7 <br />,6.5' WALK <br />• • <br />I--T-I-T-I- -T-I-T T-1- <br />1 1 1 1 1 1 1 1 1 /1/ 1 1 1 1 1 1 1 <br />TRASH ENCLOSURE <br />RE: © / <br />LOAD I NO / DE <br />PARKING (102 SPACES) <br />I I I I I I I I I I I <br />1 1 1 1 1 1 1 1 1 1 1 <br />1 1 1 k71 1 1 <br />150 L15 I N9 15 (FHA E 1) <br />/18,825 5:F.± <br />40'x36' F+ 45'x36' 45'x3q' <br />�• / 'MN • BAY / / \ BAY BAY <br />/ GONG. AREAS TO / NM <br />/` / BE COLORED NM / • r- • <br />MEM z / 14E. rim <br />... <br />11111■11. <br />TION POND <br />—COI RVA-TON- EASEMENT/DRAI RCA -GE CHANNEL <br />----92----H <br />r---91- <br />01- <br />C� (I) <br />\ --- -----Q_ <br />\ `- ----- wct <br />AL <br />\D E V E LJD\P M E N T -P,LA N <br />= 50 <br />r-9,4,,� ---- -- <br />'tid1111111110. <br />9 <br />• <br />7 04th STmPEE7`--,,,, <br />N 11111MINgillin <br />411 <br />Awl: <br />a: ‘4,.0..41,:: <br />_ :75ERVATION_ EASEMENT! -87- <br />himl <br />Vik DRAI1TAGE CHAN_NE_L _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _161711F/1 <br />11-1-111 <br />L. <br />0 <br />CD C <br />0)70 <br />Z. 4• 12 <br />▪ o <br />CD • I- <br />o <br />Suite 100 <br />co <br />co <br />co <br />o <br />co <br />4 <br />co <br />to <br />co <br />0 <br />co <br />0 <br />a) <br />-0 <br />c9, <br />0_ <br />Colorado Technological Center <br />Colorado <br />0 <br />739 South 104th Street <br />PROJ NO: 08-18 <br />DATE: OCTOBER 16, 2008 <br />REV: MAY 7, 2009 <br />AUG 10, 2009 <br />AUG 31, 2009 <br />SEPT. 25, 2009 <br />SEPT. 29, 2009 <br />Copp* C)20011- Oils <br />Cessalla P.C. Manly <br />=7.7mot be sal or <br />villwittlhe vitae <br />DEVELOPMENT PLAN <br />