My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Commission Agenda and Packet 2009 10 08 PLAN SET
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
PLANNING COMMISSION
>
2000-2019 Planning Commission
>
2009 Planning Commission Agendas Packets Minutes
>
Planning Commission Agenda and Packet 2009 10 08 PLAN SET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 12:27:41 PM
Creation date
11/23/2009 11:19:14 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
PCPKT 2009 10 08 PLAN SET
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EVERGREEN <br />(3) 2' T-POST <br />STAKES <br />-I l I -I 1 I -I 1 III=III=III=III=1 <br />II -ICI -ICI -ICI -ICI -ICI -I_ <br />IIIIII,,-III,,-III,,-III,,-III-III III III III III I <br />DECIDUOUS <br />TREE PLANTING DETAIL <br />NOTES: <br />1. TOP OF ROOT BALL TO BE 3" MIN. <br />ABOVE GRADE FOR DECIDUOUS TREES <br />AND 6" MIN. ABOVE GRADE FOR <br />EVERGREEN TREES <br />2. PLUMB AND ORIENT TREE FOR BEST APPEARANCE. <br />3. REMOVE ALL WIRE, POTS AND CONTAINERS FROM <br />ROOTBALL. <br />4. WATER THOROUGHLY AND FERTILIZE AT TIME <br />OF PLANTING. <br />DO NOT DAMAGE OR PRUNE LEADER <br />T-POST WITH 12 GA. WIRE <br />AND HOSE PROTECTOR <br />(2 FOR TREES UNDER 3' CAL. NW AND SE SIDE OF TRUNK) <br />(3 FOR TREES 3' CAL AND OVER TRIANGULATED AROUND TRUNK) <br />TREE WRAP TO FIRST BRANCH FROM <br />APRIL TO NOVEMBER <br />WOOD MULCH 4" THICK OVER TREE BALL <br />TEMPORARY PAN TO BE REMOVED BEFORE <br />SOD OR MULCH INSTALLATION <br />SCARIFY PIT BOTTOM <br />AND SIDES <br />75% EXISTING SOIL <br />III- 25% ORGANIC COMPOST <br />I III= <br />UNDISTURBED SUBGRADE <br />NO SCALE <br />SET PLANT 1'-2' <br />ABOVE EASING GRADE <br />4 WOOD FIBER MULCH <br />UNDISTURBED soil <br />PLANTING MIX <br />(SEE SPEUFICA11GNS) <br />SHRUB PLANTING DETAIL <br />NDTE^s <br />1. PLUAB AND ORIENT FOR BEST APPEARANCE <br />2. REMOVE ALL WIRE, POTS AND CONTAINERS <br />FROM ROOT BALL <br />3. KEEP CENTERS OF ALL SHRUBS A MNIMUM <br />CIF 30• FROM ALL EDGES <br />NO SCALE <br />J <br />-0-003 pivt mi.: lent <br />CO <br />N <br />;1 4 <br />>A <br />Qvl <br />4 <br />TA <br />i9l' 0 i1 .1 1&', <br />4 <br />19 <br />`'110•11 .914J" <br />-•,1 III1' <br />4 <br />4-317 <br />11 <br />i i1V "v 111 11. <br />11 VI <br />•4 wall <br />.111 11',1'' <br />11. 11111 aI <br />II 110010 <br />00.1�'11R�PI !! <br />00.1�'11R�PI !! <br />A. <br />No F <br />li .11 .,;V1Mz. <br />1[1 1r 41:ii lE <br />Iv]. 11111 <br />$' <br />L <br />4111 <br />I e4;. i.1111 1 i*!1L <br />AI ` <br />L <br />TOTAL GROMID COVERS <br />LANDSCAPE NOTES <br />1. ALL AREAS TO BE SODDED SHALL RECEIVE 3-5 CUBIC YARDS OF ORGANIC COMPOST PER 1000 S.F. TILLED TO A DEPTH OF <br />6"-10". ALL AREAS TO BE SEEDED SHALL RECEIVE 3-5 CUBIC YARDS OF ORGANIC COMPOST PER 1000 S.F. TILLED TO A DEPTH OF <br />6"-8". ALL AREAS SHALL THEN BE GRADED TO A UNIFORMLY SMOOTH GRADE. <br />2. SOD SHALL BE TURF -TYPE TALL FESCUE. <br />3. DRYLAND SEED SHALL BE A LOW -GROWING DROUGHT TOLERANT MIX, ARKANSAS VALLEY'S LOW -GROW, OR EQUIVALENT. MOIST <br />AREA SEED SHALL BE A MOISTURE TOLERANT MIX. SEED SHALL BE BROADCAST AND RAKED LIGHTLY INTO PREPARED SOIL. THE SEED <br />AREA SHALL THEN BE TOP DRESSED WITH A THIN LAYER OF COMPOST. <br />4. ALL TREES AND SHRUBS SHALL BE BACKFILLED WITH A UNIFORM MIXTURE OF 75% EXCAVATED SOIL AND 25% ORGANIC COMPOST. <br />5. ALL DECIDUOUS TREES SHALL BE STAKED WITH TWO 6' T-POSTS. ALL EVERGREEN TREES SHALL BE STAKED WITH THREE 2' <br />T-POSTS. ALL POSTS SHALL BE GUYED TO THE TREE WITH 12 GAUGE WIRE ENCASED IN RUBBER HOSE. <br />6. ALL PLANT MATERIAL SHALL BE FULLY GUARANTEED FOR A PERIOD OF ONE YEAR FROM THE DATE OF SUBSTANTIAL COMPLETION. <br />7. SHRUB BEDS AS SHOWN ON THE PLAN SHALL RECEIVE THE FOLLOWING MULCH OVER LANDSCAPE FABRIC (SEE LANDSCAPE PLAN <br />FOR LOCATIONS: <br />MULCH #1: 3" LAYER OF 3/4" WASHED RIVER ROCK <br />MULCH #2: 3" LAYER OF PIONEER "HORIZON" COBBLE MIX <br />MULCH #3: A COMBINATION OF 75% 3/4"WASHED RIVER ROCK AND 25% PIONEER "HORIZON" COBBLE MIX <br />MULCH #4: ALL PERENNIAL AND GROUND COVER AREAS AND TREE WELLS IN SOD AND SEED AREAS SHALL RECEIVE A 2" LAYER OF <br />NATURAL COLOR "GORILLA HAIR" MULCH WITH NO FABRIC UNDERLAY. <br />8. EDGING SHALL BE INSTALLED BETWEEN ALL SHRUB BEDS AND SOD OR SEED AREAS. EDGING SHALL BE JENSEN'S SALES' 14 <br />GAUGE GREEN PAINTED EDGING , ROLL TOP, 4"X10', OR EQUIVALENT. <br />9. ALL PERENNIAL AND GROUND COVER AREAS SHALL BE PREPARED BY TILLING 2-3" OF ORGANIC COMPOST AND SUPER PHOSPHATE <br />TO A DEPTH OF 8-10". THE SURFACE SHALL THEN BE GRADED TO A UNIFORMLY SMOOTH GRADE. <br />10. ALL SURFACE LANDSCAPING DAMAGED AS A RESULT OF MAINTENANCE ACTIVITIES WITHIN A PUBLIC UTILITY EASEMENT SHALL BE <br />THE OBLIGATION OF THE PROPERTY OWNER TO RESTORE AT THEIR EXPENSE. <br />11. STEPPING STONES SHALL BE 2'X2' CONCRETE, OR RANDOM RED FLAGSTONE SET ON GRADE AND SURROUNDED BY MULCH. <br />12. AT -GRADE UTILITY CABINETS OR TRANSFORMERS SHALL BE SCREENED WITH APPROPRIATE PLANT MATERIAL ON THREE SIDES. <br />WHERE FEASIBLE, PLANT MATERIAL ALREADY SHOWN SHALL BE SLIGHTLY RELOCATED TO ACCOMPLISH SCREENING. IF NECESSARY, SHRUB <br />BEDS SHALL BE EXTENDED OR NEW BEDS CREATED TO INCLUDE TRANSFORMER LOCATIONS. PLANTS SHALL BE PLACED SO AS TO <br />LEAVE A CLEARANCE OF 30" AT MATURITY OF THE PLANTS AROUND THREE SIDES OF THE TRANSFORMER(S) WITH THE FRONT SIDE <br />OPEN FOR ACCESS. <br />13. NO DECIDUOUS TREE SHALL BE PLANTED WITHIN 5' OF A PUBLIC SIDEWALK OR UTILITY. NO EVERGREEN TREE SHALL BE PLANTED <br />WITHIN 10' OF A PUBLIC SIDEWALK OR UTILITY. <br />14. SEEDED AREAS SHALL REMAIN WEED AND TRASH FREE. AFTER ESTABLISHMENT, WATERING AND MOWING SCHEDULE SHALL BE ON <br />AN AS -NEEDED BASIS. <br />IRRIGATION NOTES: <br />1. A COMPLETELY AUTOMATIC, DUAL PROGRAMMING, IRRIGATION SYSTEM COVERING ALL PLANTS AND SOD AND SEED SHALL BE <br />DESIGNED AND INSTALLED. <br />2. LOW, MODERATE, AND HIGH WATER ZONES SHALL EACH BE ON SEPARATE VALVES. <br />3. SOD AND SEED SHALL BE IRRIGATED WITH MP ROTORS AND/OR SPRAY HEADS. SOD AND SEED SHALL BE ON SEPARATE ZONES <br />4. PLANTS IN SHRUB BEDS SHALL BE DRIP IRRIGATED. <br />5. GROUND COVER AND PERENNIALS SHALL BE IRRIGATED WITH LOW PRESSURE POP-UP HEADS. <br />CALL UTILITY NOTIFICATION <br />CENTER OF COLORADO <br />1-800-922-1987 <br />CALL 2 BUSINESS DAYS IN ADVANCE <br />BEFORE YOU DIG, GRADE OR EXCAVATE <br />FOR THE MARKING OF UNDERGROUND <br />MEMBER UTILITIES. <br />NOTE: PLANT COUNT PROVIDED AS A COURTESY ONLY. <br />ANY DISCREPANCY BETWEEN THE PLANT COUNT AND THE <br />PLAN, THE PLAN TAKES PRECEDENCE. <br />LANDSCAPE ARCHITECT STAMP <br />PMewed <br />x"` <br />:tu <br />i, <br />phone: <br />fax: <br />email: <br />Laicism, Ardiitodure <br />NATURES DESIGN <br />Becky L. Martinek <br />15674 Indiana Gulch Rd. <br />Jamestown, CO 80455 <br />303-459-3333 <br />303-459-0644 <br />martinek@hughes.net <br />PLAN <br />LOT 12 <br />Lafayette, Col <br />Plan Date: <br />10/16/08 <br />evisions: <br />05/07/09 <br />08/10/09 <br />09/25/09 <br />09/29/09 <br />Sheet <br />Number: <br />
The URL can be used to link to this page
Your browser does not support the video tag.