Laserfiche WebLink
Malcolm Fleming, City Manager <br />January 22, 2010 <br />Page 2 of 4 <br />LIGHT, HARRINGTON & DAWES, P.C. <br />spaces, recreational facilities and other public and quasi - public facilities; and (D) the proposed <br />location of all streets. Id, at § 17.72.030. <br />In addition, Section 17.72.190 of the City Code also provides that the "[y]ard and bulk <br />requirements under a [PCZD] shall be specified on the [GDP] filed for the different areas of the <br />district. Such yard and bulk requirements shall be in general conformance with the yard and <br />bulk requirements set forth in chapter 17.12 of this Code." Id. at § 17.72.190 (Emphasis added). <br />For PCZDs with commercial and office uses, the "[y]ard and bulk requirements set forth in the <br />[GDP] shall be in general conformance" with the requirements for the C -N, C -B, C -C, and 0 <br />Zones. Id. The maximum principal building heights' in these zone districts are: 35 feet in the <br />C -N, C -B, and C -C districts; 25 feet in the A -O district; and 40 feet in the B-0 district (see <br />footnote 2). Id. at § 17.12.040. Section 17.72.190 makes no reference to the maximum building <br />height requirements for commercial buildings (35 feet) set forth in the City's Commercial <br />Development Design Standards and Guidelines ( "CDDSG "). Furthermore, nothing in Chapter <br />17.72 specifically allows the City Council to waive or modify yard and bulk requirements during <br />its review of the GDP. <br />2. PUD Code Provisions. For property within a PCZD, an applicant can <br />request a PUD overlay in accordance with the requirements set forth in Chapter 17.28 of the City <br />Code. For example, a PUD -C overlay can be approved for property zoned PCZD -C. Id. at § <br />17.28.030.2. As part of the PUD application process, an applicant is required to submit a <br />preliminary development plan ( "PDP ") that contains information about, among other things, <br />proposed land uses, the type and character of the proposed development, and the location of <br />streets. The applicant is also required to submit a final development plan ( "FDP ") that contain <br />information about, among other things, the location of proposed buildings, the maximum height <br />of all buildings, and proposed architectural elevations. Id. at § 17.28.160.0 and 180.B_ Roth <br />the PDP and FDP must be reviewed and acted on by the Planning Commission and City Council <br />at public hearings. Id. at § 17.28.170 and 190. <br />2 There is no "0" zone; the reference to "0 Zones" is to the Administrative- Office (A -0) zone district and the <br />Business -Office (B -0) zone district. See City Code '§ 17.12.010. <br />3 This memorandum focuses on maximum building height requirements as it is our understanding this is the main <br />point at issue in the ConocoPhillips GDP; it does not fully analyze the other yard and bulk requirements, such as lot <br />size and setbacks, set forth in City Code § 17.12.040. <br />Your January 18, 2010 email asked whether the GDP /PCZD and PUD processes can take place concurrently_ A <br />PUD is established by overlaying a PUD development plan over zoned property. City Code § 17.28.030. However, <br />nothing in the City Code prohibits concurrent processing of applications for PCZD zoning and preliminary PUD <br />approval. See also City Code § 17.44.080 (zoning of land in the process of annexation may occur concurrently with, <br />but not prior to, annexation), <br />5 Section 17.28.180.B.4 of the City Code states that "[t]he maximum height of all buildings shall be stipulated" and <br />that "[s]pecific consideration must be given to the maximum height of structures or significant views which may be <br />obscured," <br />