My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 1973 08 07
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
1973-1989 City Council Agendas and Packets
>
1973 City Council Agendas and Packets
>
City Council Agenda and Packet 1973 08 07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 1:30:32 PM
Creation date
12/28/2009 3:26:42 PM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Packet
Signed Date
8/7/1973
Supplemental fields
Test
CCAGPKT 1973 08 07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Crs of Lo gimmt boosts <br /> 1. Hover Road • Realign and bring up to standard from 3rd Avenue north to 11th Avenue. <br /> 2, Colorado #66 • Four•laning of Colorado 166 through the Intersection with Main Street (U.S. 1287) north of Longmont. <br /> 3, Lashley Road • Develop and improve intersections of this road at Third, Ninth, Mountain View, Seventeenth Avenue <br /> and Colorado moo, <br /> 4, Improve the intersection of Ibver Road at Colorado 166, and Hover Road and Nelson. <br /> 5. Price Street from 3rd Avenue south to incl'ide bridge and intersection at Colorado 1119 and Nelson, <br /> URBAN EXTENSION <br /> City of Boulder Requests <br /> 1, Construct a portion of the Pearl Street arterial from the Foothills Parkway west to the creation of the Pearl/ <br /> All Spruce one-way pair, <br /> 2, The development of Broadway from University Avenue to Canyon Boulevard. Reconstruct Broadway from Marine Street <br /> to Canyon Boulevard as a one-way pair consistent with using Broadway and 14th Street in place of Broadway alone. <br /> NEEDED STATE HIGHWAY IMPROVEMENTS <br /> Boulder County Requests <br /> 1. Colorado #42 and Colorado 17 - Intersection improvement to increase sight distance in southeast corner, add left <br /> turn lanes on Colorado 11 and Colorado 142, acceleration and deceleration lanes on Colorado 11. <br /> 2. Baseline Road (Colorado 07) and East County Line Road - Improvement to intersection to provide acceleration and <br /> deceleration lanes on Colorado 17. <br /> 3, Colorado 11 and U.S. 1287 • Intersection improvement to increase sight distance on northwest corner, eliminate <br /> two-way traffic on 'Y" actions of the intersection tfy construction of a "T" intersection with free right turns, <br /> add a left turn lane on northbound U.S. 1281. <br /> 4, Install railroad safety light south of tracks on 63rd Street and tie in with intersection lights. <br /> III 5, Improvement of 51st Street, Jay Road and Colorado 1119 Intersection - Channelixe to improve storage of 51st <br /> Street and Jay Road traffic west of southbound Colorado 1119, <br /> 6. Niwot Road and U.S, #287 • Intersection improvement to increase sight distance in southwest corner, add left <br /> turn lane on northbound U.S. #287. <br /> 7, Colorado 152 and U,S, 1287 - Intersection improvement to increase sight distinct in northwest corner. <br /> 8. Broadway and Grinnell - Construction of a pedestrian overpass or underpass across Broadway. <br /> City of Lafayette Requests <br /> 1, U.S, 1281 and South Boulder Road • Traffic signal Installation for pedestrian safety if study shows warrants <br /> exist, addition of cross-walk, <br /> 2. U,S. 0287 and Emma Street • Traffic signal installation for pedestrian safety if study shows warrants exist, <br /> addition of cross-walk. <br /> 3, U,S, 1287 and Baseline Road - Intersection improvement to provide left turn northbound 1281 to westbound <br /> Baseline Road, improve delineation of intersection by islands, landscaping project for roadside park. <br />
The URL can be used to link to this page
Your browser does not support the video tag.