Laserfiche WebLink
SECTION 7. Section 17. 16.080 of Title 17 of the Louisville <br /> Municipal Code dealing with exception to building height regulations <br /> is hereby repealed. <br /> SECTION 8. The following section is hereby added to Chapter <br /> 17. 16 of Title 17 of the Louisville Municipal Code: <br /> • <br /> 17. 16.090 Exceptions to building height regulations_ <br /> The following type of structures or structural parts are not <br /> subject to the building height limitations as this title; chimneys, tanks, <br /> church spires, belfries, domes, monuments, fire and hose towers, V` <br /> observation towers, transmission towers, flagpoles„ commercial radio <br /> and television towers, masts, aerials, cooling towers, elevator shafts, <br /> ranch and farm accessory uses, and other similar projections. <br /> SECTION 9. The following section is hereby added to Chapter 17.16 <br /> of Title 17 of the Louisville Municipal Code: <br /> 17. 16.240 Oil and gas exploration and production. <br /> Oil and gas exploration and production may be permitted in the <br /> Agricultural District as a use by special review. In addition to meeting <br /> the requirements for special review as specified in Chapter 17.40, the <br /> application shall include a report stating the impact of the proposed <br /> operation on adjacent properties and development; the proposed measures <br /> to mitigate any adverse impact; and a summary of unavoidable adverse <br /> impact. <br /> A. Said report shall address the following items and other items <br /> as may be required to adequately evaluate the impact of the proposal <br /> operation: <br /> 1. Proof of mineral right ownership. <br /> 2.. Schedule of exploratory drilling. <br /> 3_ Provision for drill site, tank battery and pipeline valve security. <br /> 4. Aural and visual screening provisions of drill site and tank battery. <br /> S. Night lighting <br /> 6. Flaring. <br /> 7. Geologic analysis including subsidence potential following <br /> production. <br /> 8. Provisions for access. <br /> 9. Provision for hauling to and from the tank battery. <br /> 10.. Site maintenance and clean up. <br /> 11. Reclamation plan. <br /> 12. Liability and property damage insurance. <br /> 13. Performance bond. <br /> .y.� r <br />