Laserfiche WebLink
CITY OF LOUISVILLE <br /> DEPARTMENT OF PARKS AND PRECREATION <br /> SOUTH PARK <br /> Phase One <br /> COST ANALYSIS <br /> ITEM PROJECTED COST <br /> Design and Engineering $ 3,000 <br /> Earthwork 7 ,000 <br /> Seed and Soil Prep 5,000 <br /> Sod (For the ballfield areas) 22,000 <br /> Irrigation 36,000 <br /> Backstops (2) 4,000 <br /> Fencing 3,000 <br /> Walks 3,600 <br /> Concrete Bleacher Pads 6,300 <br /> Signs 1 ,000 <br /> Utilities (water) 1 ,300 <br /> Bleachers 23,000 <br /> Contingency 2,500 <br /> Total $ 97,000 <br /> Federal Funds $10,500 <br /> City matching 10,500 <br /> • <br /> Addition City Funds 76,000 <br /> $97,000 <br />