My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 1979 06 05
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
1973-1989 City Council Agendas and Packets
>
1979 City Council Agendas and Packets
>
City Council Agenda and Packet 1979 06 05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 1:30:40 PM
Creation date
12/29/2009 10:47:41 AM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Packet
Signed Date
6/5/1979
Supplemental fields
Test
CCAGPKT 1979 06 05
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a_ � .• <br /> • <br /> ORDINANCE NO. 647 • - <br /> AN ORDINANCE AMENDING TITLE 15 OF THE <br /> LOUISVILLE nUNICIPAL CODE, BY INCREASING <br /> THE AVERAGE PER SQUARE FOOT VALUATION <br /> FOR WOOD FRAnE DWELLING CONSTRUCTION. <br /> WHEREAS, the costs of construction materials and labor <br /> have increased; and x� <br /> WEIODMAS, the City Council, upon the recommendation of <br /> the Building Department, has determined that these increased costs <br /> should be more accurately reflected by the valuation as set forth <br /> in the Uniform Building Code. <br /> NOW, THEREFORE, BE ZT ORDAINED BY THE CITY CaOUNCIL OF <br /> THE CITY OF LOUISVILLE, COLORADO: <br /> Section 1. Section 15.04. 100 Chapter 15.04, Title 15 of <br /> the Louisville Municipal Code is hereby repealed. <br /> Section 2. The following Section is hereby added to <br /> Chapter 15.04, Title 15 of the Louisville Municipal Code: <br /> 15.04.100 Schedule for Wood Frame Construction Valuation <br /> The following schedule is added to the Uniform Building <br /> Code, 1976 Edition: <br /> "For Type V - Wood Frame Dwelling Valuation - <br /> Average Construction" . <br /> Basic Structure $ 28.00 per sq. ft. <br /> (Includes finished garden level, <br /> main and upper floors) <br /> Basement <br /> Unfinished Included <br /> Finished 8.00 per sq. ft. <br /> Garage (attached) 8.00 per sq. ft. <br /> Unfinished, Enclosed Patio 8.00 per sq. ft. <br /> Open Patio or Porch 2.00 per eq. ft. <br /> Unfinished Garden Level 10.00 per sq. ft. <br /> INTRODUCED, READ AND ORDERED PUBLISHED this day of <br /> , 1979. • <br /> Mayor <br /> ATTEST: <br /> City Clerk `- <br />
The URL can be used to link to this page
Your browser does not support the video tag.