AGENDA DESCRIPTION <br /> Construction and installation of the North Louisville Interceptor <br /> Sewer is proceeding on schedule. The contractor has installed <br /> sewer line from the Wastewater Treatment Plant to South Boulder <br /> Road. The original bid specifications specified that South <br /> Boulder Road was to be crossed with open cut construction and <br /> temporary roadways was to be installed adjacent to the current <br /> South Boulder Road. The project bid in early 1986 identified a <br /> jack and bore whereby the pipe would be pushed under the road and <br /> no disruption of traffic would occur . Due to the high cost on <br /> the original bid, the City eliminated this more expensive item of <br /> work from the rebid project . <br /> Because favorable bids were received on the rebid project , the <br /> City asked the contractor to evaluate additional costs to jack <br /> and bore the South Boulder Road crossing rather than open cut it. <br /> The purpose for this type of construction versus open cut, is <br /> that it provides much greater safety to the motoring public and <br /> exposes the contractor and the City to much less liability. Jack <br /> and bore of the South Boulder Road crossing would also eliminate <br /> the inconvenience and disruption to traffic that is inherent in <br /> an open construction with temporary roadway repairs. The <br /> contractor submitted to the City a Change Order identifying an <br /> additional $3095.00 in project cost in order to cross South <br /> Boulder Road with a jack and bore operation versus a open cut <br /> technique. <br />