My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 1987 03 16
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
1973-1989 City Council Agendas and Packets
>
1987 City Council Agendas and Packets
>
City Council Agenda and Packet 1987 03 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 1:46:57 PM
Creation date
12/29/2009 2:44:28 PM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Packet
Signed Date
3/16/1987
Supplemental fields
Test
CCAGPKT 1987 03 16
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION L <br /> CONTRACT CHANGE ORDER <br /> -Stitt - r r cr <br /> March 90 1987 <br /> Dainty _ oat* <br /> Contract For: LOUISVILLE WASTEWATER TREATMENT PLANT EXPANSION <br /> Owner: CITY OF LOUISVILLE, COLORADO <br /> To: ROSERT DOUGAN CONSTRUCTION CO. INC. <br /> on aC .r <br /> You are hereby requested to comply with the following changes from the contract <br /> plans and specifications: <br /> Description of Changes DECREASE INCREASE <br /> Supplemental Plans d Specs Attached Contract Price Contract Price <br /> I. Furnish and install additional <br /> mbar dowels in S. D. facility. $ 1,742.00 <br /> 2. Overtxcavation and additional <br /> select structural fill required <br /> in aeration/clarifier basin. 5,250.00 <br /> 3. Install 24-inch PVC effluent <br /> pipeline and 60-inch manhole. 1,583.00 <br /> 4. Furnish and install washed rock <br /> and filter fabric - chlorine <br /> contact basin foundation. 2,816.00 <br /> 5. furnish and install washed rock <br /> and filter fabric - office/ <br /> laboratory building foundation. 2,041.00 <br /> 6. Raise existing electrical cell box. 350.00 <br /> 7. Famish and install masonry con- <br /> struction joints - S.D. facility. 189.00 <br /> 8. Provide 8-inch core drill - <br /> existing aeration basin. 300.00 <br /> 9. Raise S.D. facility 1'-0". 1,582.00 <br /> 10. increase lower level office/ Y <br /> laboratory facility - 160 ft.'. 4,750.00 <br /> TOTALS $ -0- 52;6037QIT <br /> NIT C)AN1GE IN CONTRACT PRICE 3 $ZO,603.00 <br /> JUSfIFICkTION: <br /> (SEE ATTACHMENT) <br />
The URL can be used to link to this page
Your browser does not support the video tag.