My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 1987 07 21
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
1973-1989 City Council Agendas and Packets
>
1987 City Council Agendas and Packets
>
City Council Agenda and Packet 1987 07 21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 1:46:58 PM
Creation date
12/29/2009 2:58:25 PM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Packet
Signed Date
7/21/1987
Supplemental fields
Test
CCAGPKT 1987 07 21
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> • Contract Change Order f 3 <br /> Page 2 of 3 <br /> DECREASE INCREAtr <br /> Description of Changes Contract Price Contract Price <br /> 9. Repair groundwater seepage in wall 'cold <br /> joint', lower level pump room expansion. 675.00 <br /> 10. Furnish and install additional steel angle <br /> roof deck supports. 500.00 <br /> 11. Increase size (volume) of relocated scum <br /> pit tank. 3650.00 <br /> TOTALS S 150.00 S 12,015.00 <br /> WET CHANGE IN PRICE S 11,865.00 <br /> JUSTIFICATION: <br /> 1. Requested by Owner; decrease excessive machinery noise from upper level <br /> office/laboratory. <br /> 2. Requested by Owner; long-term operation/maintenance use. <br /> 3. Required to facilitate increased roof height; minimal decrease in thermal <br /> efficiency, no change in HYAC required. <br /> 4. Requested by Owner; long-term operation/maintenance use. <br /> 5. Installed to provide more positive air seal on pipe. <br /> 6. Required due to roof joist spacing and total pipe load supported. <br /> 7. Required to accommodate window widths. <br /> 8. Requested by r)wner; larger unit required for necessary service. <br /> 9. Required due to joining existing foundation to new foundation. <br /> 10. Required to provide adequate support at minimum roof deck spans, <br /> 11. Recommended based oó operation of existing system. <br /> The mount of the Contract will be (increased) by the sum of 5(11,865.00), <br /> t Eleven Thousand Eight Hundred Sixty-Five and no/100 Dollars, <br /> The Contract Total including this and previous change orders will be: <br /> Two Million Two Hundred Fifty-Two Thousand Six Hundred Forty-Three and no/100-- <br /> Dollars, (S21252.643.00). The Contract Period provided for completion will be <br /> .m changed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.