Laserfiche WebLink
. <br /> • <br /> • <br /> sloop Coil (reek 'laetwee* Diller Road and Cherry <br /> Street. Of the 717 aerie, approximately 104.5 also* <br /> will be dedicated to the City for use as a gulf <br /> course and 113.2 acres will be developed with 434) . ` <br /> residential units. <br /> wanush stated that the net density would be <br /> approximately 3.9 units/acre with the gross density <br /> being 1.9 units/acre. The project proposes a six ,• <br /> Year. build-out. These units would geoerate • • <br /> os <br /> apprcolaalt.ly 10 studeets odds/ to the school <br /> ■ystea with. 75 is the elementary eoboolS4 ahoOk. = <br /> elementary studentammileas aninneiwthet <br /> • ' `. 1• <br /> bui .$. fha i _ % • .5M <br /> ` j 4 r 4 yr <br /> r •,�. .. •• - fifer r .0:MktgAili <br /> �tioasr 3►1. <br /> tea*18114 stud dedirratior .tom .r <br /> OOQxes should oocur at the time of aneexatiosi 'ptie.•the letter of credit to cover unanticipated , . . <br /> { <br /> shortfalls is ,golf coons* operations abasi +i.. <br /> plane at the tips of anoexs►tias t 3) no more this I <br /> units should be allocated in the first two years • <br /> (beginning with subdivision approval) allowing units <br /> to be carried forward and thereafter 75 units trill <br /> be allocated is each year with no u ry-awreir f 4 <br /> water rights sort be dedicated to the City at, <br /> time of annezatioat 5) drainage plans for <br /> residential development suit be coordinated with the. <br /> golf course design; 6) any infrastructural <br /> improvements needed for the residential deve3opmeet . <br /> that must utilise the golf course (water lines. <br /> sewer drainage, etc.) should be identified and <br /> oo etrected prior to or simultaneously with the <br /> construction of the oourset 7) it is the <br /> responsibility of the enamor to construct Dilles <br /> Mad from Smart parcel Q to South (Nth Street and <br /> Cherry Street as it borders their property to <br /> collector standards. Sinop Dillon will eventually <br /> be an arterial, the &ADO ar will either construct <br /> Di lloa and get recovery from the City and/or <br /> adjacent property owners or, if timing is a problem, <br /> escrow, with the City, the cost of a collector. <br /> #emaxor also agrees to participate in the <br /> construction of South 55th Street. The extent of <br /> this participation will be determined by separate - - <br /> agreement with the Sealth Park. In addition, the <br /> annexvr should agree to oaatribute one half the cost <br /> • of a collector street towards the constructioe of <br /> Cherry Street. These Lesvos will be decided at the <br /> time of subdivision, •) is addition to the bike <br /> trail share on the general development plan, the <br /> ansexos suet construct a trail to ooanect leritage <br /> Park with the Coal Creek trail/ !) the cost of all <br /> easements previously purchased by the City or <br /> . <br />