Laserfiche WebLink
This license shall include approximately 75 miles of underground construction and 7 miles of <br />aerial installation. The underground construction shall be completed by horizontal directional <br />drilling. The aerial installation shall be completed via application, approval, and attachment via <br />Xcel Energy and Lumen and comply with all stated requirements. No incremental new poles will <br />be added as part of this process. <br />Location of the Optical Line Terminal Cabinet: <br />For the purposes of aggregating traffic within the City, licensee shall install one (1) optical line <br />terminal (OLT) cabinet. The OLT shall be located at the northeast corner of the intersection of <br />Via Appia Way and Tyler Avenue. The final location shall be subject to review by the City and <br />Xcel Energy power availability. The cabinet to be installed shall be as follows: <br />• Commscope CMC-21 Optical Line Terminal Cabinet, including a Nokia 7360 FX-8 and <br />other associated Optical Equipment <br />CMC-21 <br />• 21RU of rack space <br />• Combine equip / radios / batt <br />• Batt option — up to 3 strings [170ah ea) <br />(shown wf thermosiphorr cooling option) <br />22 cu ft <br />15 cu ft <br />28" W x 28" D (standard) 1 170 Ibs* <br />18 <br />