Laserfiche WebLink
Paln -SOW <br />,P ., —' —' G �V w ,`4 �...� w,. —., DRAFT <br />Figure 2. Areas of Pending Change <br />Oar Mar LAW. <br />Existing Land Use and Areas of Pending Change <br />w.... <br />MEI <br />Louisville on a map (see Figure X). Attendees at that meeting also described <br />their concerns for each Area of Change (found in June 30 Public Meeting <br />Summary. pdf). <br />From these comments, the consultant team and Technical Advisory Committee <br />inventoried, explored appropriate land use ratios, and formulated conceptual <br />options for each Area of Change. A minimum of 2 options (a "build -out under <br />current zoning" option and 1 -3 additional considerations) were developed for <br />each of the 7 Areas. It was explained that conceptual options for each Area were <br />in no way final, but rather displayed the range of choices to be made for each <br />Area and provided a starting point for discussion. <br />2 <br />