Laserfiche WebLink
! <br />FIELD <br />CONSULTATION <br />REQUIRED <br />Bridge Width = 9' 11" <br />Area = 5741 SQ.FT. <br />Needed Tonnage for 3" Rock = 24 <br />8 <br />Segment Length = 734' <br />Area = 3984 SQ.FT. <br />Minimum Width = 7' 1" <br />3 <br />Needed Tonnage for " Rock = 17 <br />8 <br />Maximum Width =10' 2" <br />Segment Length = 623' <br />Average Width = 8' 7" <br />Minimum Width = 6' 5" <br />Area = 8313 SQ.FT. <br />Maximum Width =10' 0" <br />Needed Tonnage for 3" Rock = 35 <br />Average Width = 8' 3" <br />8 <br />Segment Length = 1026' <br />Minimum Width = 6' 10" <br />Maximum Width =14' 4" <br />Average Width = 10' 3" <br />N <br />n.t.s. <br />FIELD <br />CONSULTATION <br />REQUIRED <br />Area = 3986 SQ.FT. <br />Needed Tonnage for 3" Rock = 15 <br />8 <br />Segment Length = 360' <br />Minimum Width = 8' 6" <br />Area = 7166 SQ.FT. <br />Maximum Width =11' 6" <br />Needed Tonnage for 3" Rock = 30 <br />8 <br />Average Width = 10' 0" <br />Segment Length = 1263' <br />Minimum Width = 5' 1" <br />Maximum Width =16' 10" <br />Area = 3713 SQ.FT. <br />Average Width = 10' 6" <br />3 <br />Needed Tonnage for " Rock = 16 <br />8 <br />Segment Length = 440' <br />Area = 2106 SQ.FT. <br />Minimum Width = 6' 8" <br />3 <br />Needed Tonnage for " Rock = 9 <br />8 <br />Maximum Width =10' 0" <br />Segment Length = 312' <br />Average Width = 8' 4" <br />Minimum Width = 6'1" <br />BELLA VISTA DRIVE <br />ASPEN WAY <br />Maximum Width = 7'8" <br />Average Width = 7'0" <br />Area = 2506 SQ.FT. <br />Needed Tonnage for 3" Rock = 11 <br />8 <br />DAHLIA WAY Segment Length = 248' <br />DAHLIA DRIVE <br />Minimum Width = 8' 5" <br />Maximum Width = 9' 9" <br />Average Width = 9' 4" <br />Area = 9953 SQ.FT. <br />Needed Tonnage for 3" Rock = 42 <br />8 <br />Segment Length = 1123' <br />Minimum Width = 8' 5" <br />Maximum Width =10' 3" <br />Average Width = 9' 4" <br />SOUTH <br />Area = 12,247 SQ.FT. <br />Needed Tonnage for 3" Rock = 51 <br />8 <br />Segment Length = 1189' <br />Minimum Width = 2' <br />Area = 2011 SQ.FT. <br />Maximum Width =10' 0" <br />Needed Tonnage for 3" Rock = 8 <br />8 <br />Average Width = 8' 8" <br />Segment Length = 203' <br />Minimum Width = 9' 0" <br />Maximum Width =11' 5" <br />Area = 7287 SQ.FT. <br />Average Width = 10' 3" <br />CHERRY STREET <br />Needed Tonnage for 3" Rock = 30 <br />8 <br />Segment Length = 842' <br />Minimum Width = 6' 8" <br />Maximum Width = 12' 8" <br />Area = 2273 SQ.FT. <br />Average Width = 9' 8" <br />3 <br />Needed Tonnage for " Rock = 10 <br />8 <br />Segment Length = 241 <br />TRAIL SEGMENT 2 <br />Minimum Width = 9' 0" <br />Maximum Width =9' 10" <br />Average Width = 9' 0" <br />Bridge Width = 10' 0" <br />Area = 2,613 SQ.FT. <br />3 <br />Needed Tonnage for " Rock = 11 <br />8 <br />Segment Length = 304' <br />Minimum Width = 8' 7" <br />Maximum Width = 9' 11" <br />Average Width = 8' 9" <br />! <br />FIELD <br />CONSULTATION <br />REQUIRED <br />Area = 9,393 SQ.FT. <br />3 <br />Needed Tonnage for " Rock = 39 <br />8 <br />Segment Length = 964' <br />Minimum Width = 8' 4" <br />Maximum Width =10' 11" <br />Average Width = 9' 3" <br />BAREGROUND 8'6" TO NORTH <br />FIELD CONSULTATION REQUIRED <br />Bridge Width = 9'10" <br />! <br />Open Space <br />Area = 10,323 SQ.FT. <br />Needed Tonnage for 3" Rock = 43 <br />8 <br />Segment Length = 870' <br />Minimum Width = 8' 7" <br />Maximum Width =14' 6" <br />Average Width = 12' 9" <br />Division <br />EXPLANATION <br />Area = 18,110 SQ.FT. <br />Needed Tonnage for 3" Rock = 76 <br />8 <br />Segment Length = 1755' <br />Minimum Width = 8' 2" <br />Maximum Width = 13' 11" <br />Average Width = 8' 6" <br />EQUIPMENT ACCESS POINT <br />CONCRETE SLAB <br />TRAIL SEGMENT 1 <br />! <br />EQUIPMENT SIZE LIMITS <br />BRIDGE <br /> x' x'' <br />KNOWN LOW <br />TRAIL WIDTH AT <br />AREA <br /> THAT POINT <br />NOTES <br />36 <br />