My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Historical Museum Advisory Board Agenda and Packet 2024 03 20
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
HISTORICAL MUSEUM ADVISORY BOARD (pka HISTORICAL COMMISSION)
>
2024 Historical Museum Advisory Board Agendas and Packets
>
Historical Museum Advisory Board Agenda and Packet 2024 03 20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2024 1:45:14 PM
Creation date
3/27/2024 11:32:17 AM
Metadata
Fields
Template:
City Council Records
Meeting Date
3/20/2024
Doc Type
Boards Commissions Committees Records
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Is this a new or existing CIP? New <br />Check box if grant funded: Cl C <br />Project Name: Museum Improvements <br />Submitted By: Public Works Version: 2/14/2024 <br />Program(s): Sub-Program(s): <br />Funding Source(s): Percent <br />Cultural Services Facilities Maintenance <br />Capital Projects Fund 100% <br />100% <br />Equipment or Year 1 Year 2 Year 3 <br />Year 4 Year 5 Year 6 Six -Year <br />Project Costs 2025 2026 2027 <br />rDesign <br />2028 2029 2030 Total <br />Acquisition <br />& Engineering <br />Prof Services <br />- <br />ruction 114,000 <br />114,000 <br />Other Equip/Project Costs <br />- <br />Capital Equipment Purch <br />- <br />Contingency 17,100 <br />17,100 <br />Total Costs (Gross) 131,100 <br />131,inn <br />Grants or Other <br />Off -Setting Revenue <br />Impact to Annual <br />Maint/Operating Costs <br />Description & Proposed Funding: <br />Equipment/Project Description: <br />Request includes New Parkin Lot Lighting m alley, Pathway lighting <br />q 9 9 9� Y� Y <br />throughout the Museum Campus, Refinishing of the Wood floor in <br />Jacoe Store, New Paint on Tomeo Floor, paint all interior walls at 3 <br />buildings, Resealing of Windows at all buildings, and reconstruction of <br />the Tomeo Stairs at Main Street. <br />1+' <br />� O�J1SV <br />��- <br />s( r, <br />Project revenue or grants that will support the project and the <br />impacts to the operating budget: <br />9 ldd. s <br />( <br />Painting the interior floor will prolog the life. Sealing the windows will <br />increase the efficiency and prevent drafts through broken seals. <br />� <br />F - <br />t <br />I' <br />Reference to Plan being implemented (i.e., Master Plan): <br />Narrative ... <br />Justification and Alignment with Program/Sub-Program Goals & Key Performance Indicators: <br />The interiors of the Museum Houses have not been refreshed for many years. A refresh of the interior will protect and prolong the life of <br />the floors as they are heavy traffic areas. The windows of the Museum house date back to the 1990's and should be resealed to increase <br />the energy efficiency of the buildings. <br />Department Priority Ranking: <br />Request Number: (Finance Use) <br />
The URL can be used to link to this page
Your browser does not support the video tag.