Laserfiche WebLink
City of Louisville <br />749 Main Street Louisville, Colorado 80027 <br />Date of Preparation r- 3 /- 90 <br />Model cri✓vEz6,to4toD <br />Builder 5-rs'Vs ,e--p <br />COMPUTATION OF FEES FOR BUILDING PERMITS <br />JOB ADDRESS L EvA.Gr LOTIS$BLOCK SUBDIVISIONLo.arv1ljc4f <br />A. BUILDING VALUATION (Exterior Measurements) <br />Main Floor ',,' Sq.Ft.@$48/sq.ft.=$ <br />Second Floor Sq. Ft. @$48/sq. ft.= <br />LAKO toi..•.4dt Basement Finished 1'"74 8" Sq. Ft. @$48/sq. ft.= $31O'( =o <br />►44` Walkout Basement(Unfin) — Sq.Ft.@$23/sq.ft.= <br />Attached Garage & <br />Enclosed Patio I IxCJ Sq. Ft. @$20/sq. ft.= 2.1.4co.,u <br />Open Patio/Porch — Sq.Ft.@$10/sq.ft.= — <br />pther(explain) 23S Sq.Ft.@$ZO/sq.ft.= 470D•oC) <br />Sta.:0...al A a►w.1. bPe.�2rtr+,> BUILDING VALUATION =$ / / D Oc>�/ <br />PERMIT AND <br />AND PLAN CHECK FEE <br />Permit fee(from table 3-A of UBC) = ‘ .57.-=' <br />per section 15.04.030 municipal code <br />Plan Check Fee (65% of permit fee) = `_rO 7 0 <br />Part A sub total =$ // /7-d <br />B. SERVICE EXPANSION FEE (Interior Measurements -Finished Floor <br />Area Only -Measure From Interior of <br />All Exterior Walls) <br />Total of All Finished Floor Area <br />l 5 �ry96 @ $2.25/Sq. ft. �'j s 64.a6 <br />Part B sub total =$ 3 S 6 <br />C. COMPUTATION OF FEES AND ASSESSMENTS <br />1.Permit & Plan Check(From A)01.100.510.5121..$ ///r 9 <br />2.Service Expansion Fee(From B) <br />a.Capital Improvement Fund 11.100.500.5540..$ <br />b.Bellock Golf Course Escrow44.100.550.5540..$ <br />3.Water Tap Fee 41.100.510.5130..$ -� iv <br />4.Homart Water Recovery Fee 41.015.360 $ 2 y o�J <br />5.Sewer & Inspection Fee 42.100.510.5131..$ 2 3 3 <br />6.Major Thoroughfare Fee 11.100.550.5542..$ -- <br />7.Homart Major Thoro. Recovery11.015.360 $ <br />8.Sewer Recovery Fee 01.015.358 $ — <br />9.Drainage Recovery Fee 01.016.408 $ <br />10.Storm Drainage Fee 11.100.550.5545..$ -- <br />11. Other (Homart Sewer Tap) 42.015369 $ -- <br />r 3 12.Tree Fund($35/40 Lineal feet).11.100.550.5541$ /dS-' <br />35 6ef <br />Part C sub total =$ /03,Y8c�.:j <br />D. TOTAL OF FEES AND ASSESSMENTS <br />Permit # /sy3 <br />Tap # 3 L <br />Part C sub total <br />* Less Pre-Paids <br />GRAND TOTAL== $ <br />=$ Az, moo.,o <br />$ ///.{_. 17P6-/-9c) <br />*If the city grants a "Foundation Only" permit and allows <br />payment of only permit and plan check fees, such a courtesy <br />does not "lock in" the remainder of the fees. This computa- <br />tion sheet is an estimate only and is valid for the day <br />given. No pre -payment is permitted without completion of <br />other components of the permit. <br />rev 4/90 <br />