Laserfiche WebLink
DocuSign Envelope ID: 9C6525B2-F542-4BF9-B789-C281047E41A9 <br />Dual Fuel Heat Pump Rooftop Unit <br />$3,000/ton <br />$1,500/ton <br />Electric Infrastructure Upgrade <br />100% of costs capped at $4,000. <br />Electric Infrastructure Upgrade <br />100% of costs capped at $4,000. <br />EnergyStar Certified Heat Pump Water Heater <br />$3,000/unit <br />$1,500/unit <br />Replacing Gas Water Heater with ENERGY STAR <br />Certified Electric Water Heater <br />$2,000/unit <br />$1,000/unit <br />Window Film with SHGC <_ 0.35 <br />$3.00/SF <br />$1.50/SF <br />Roof insulation* standard <br />$0.62/SF <br />$0.32/SF <br />Roof insulation* for businesses <2,500 square <br />feet and nonprofits that serve low-income <br />populations <br />$1.28/SF <br />$0.64/SF <br />Attic insulation R-49 standard <br />$0.32/SF <br />$0.16/SF <br />Attic insulation R-49 for businesses under 2,500 <br />square feet and nonprofits that serve low- <br />income populations. <br />$0.64/SF <br />$0.32/SF <br />Wall insulation** standard <br />$0.12/SF <br />$0.06/SF <br />Wall insulation** for businesses under 2,500 <br />square feet and nonprofits that serve low- <br />income populations. <br />$0.24/SF <br />$0.12/SF <br />*AII City of Louisville rebates are capped at $5,000 per business participant <br />Fees <br />Amount per <br />check <br />Third party check processing fee <br />$10.10 <br />Equity Priority Buildings: <br />A building may qualify as an Equity Priority Building if it houses one or more businesses that <br />serve frontline community members: people that are more vulnerable to the impacts of climate <br />change due to factors including income, race, language, age, documentation status, disability, <br />and more. <br />Equity Priority Buildings include: <br />