My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Historic Preservation Commission Agenda and Packet 2024 06 17
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
HISTORIC PRESERVATION COMMISSION
>
2024 Historic Preservation Commission Agendas and Packets
>
Historic Preservation Commission Agenda and Packet 2024 06 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2024 10:15:08 AM
Creation date
6/26/2024 3:28:09 PM
Metadata
Fields
Template:
City Council Records
Meeting Date
6/17/2024
Doc Type
Boards Commissions Committees Records
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1209 Main Street <br />Revised: 4/1/24 <br />Preservation & Restoration grant requests highlighted <br />High Priority <br />Task <br />Quantity <br />Unit <br />Unit Cost <br />Total <br />3.2 Structural Systems <br />Determine source of leak by sprinkler control <br />box, and repair <br />1 <br />EA <br />$ <br />1,000.00 <br />$ <br />1,000 <br />3.4 Envelope - Roofing and Waterproofing <br />Redirect Downspouts away from building <br />Foundation waterproofing <br />1 <br />1 <br />EA <br />EA <br />$ <br />$ <br />2,500.00 <br />10,500.00 <br />$ <br />$ <br />2,500 <br />10,500 <br />3.8 Electrical Systems <br />Evaluate electrical system <br />Electrical system repairs <br />1 <br />1 <br />EA <br />EA <br />$ <br />$ <br />1,000.00 <br />10,000.00 <br />$ <br />$ <br />1,000 <br />10,000 <br />Subtotal High Priority Costs <br />$ <br />25,000 <br />Other <br />Permits, Contractor O&P, Professional fees <br />15% <br />$ <br />3,750 <br />Subtotal <br />$ <br />28,750 <br />Contingency <br />10% <br />$ <br />2,875 <br />Total High Priority Costs <br />$ <br />31,625 <br />Low to medium Priority <br />Task <br />Quantity <br />Unit <br />Unit Cost <br />Total <br />3.1 Site <br />Fencing repair <br />Install drainage at rear and sides of home <br />1 <br />1 <br />EA <br />EA <br />$ <br />$ <br />1,500.00 <br />2,500.00 <br />$ <br />$ <br />1,500 <br />2,500 <br />3.2 Structural System <br />Redesign front porch floor to prevent water <br />infiltration into the basement <br />Reinforce floor, ceiling and roof framing <br />1 <br />1 <br />EA <br />EA <br />$ <br />$ <br />8,500.00 <br />16,000.00 <br />$ <br />$ <br />8,500 <br />16,000 <br />3.3 Envelope - Exterior Walls <br />
The URL can be used to link to this page
Your browser does not support the video tag.