Laserfiche WebLink
PPLAB Minutes <br />May 1, 2024 <br />Page 4 of 16 <br />o Joe Carnival <br />■ Demolition is complete <br />■ Drainage system changes needed; don't anticipate change to <br />schedule or budget, critical path is play equipment which <br />should be shipped soon <br />■ There are pre -approved City Council contingency funds if <br />needed for drainage changes <br />■ Aiming for early summer opening <br />• Sunflower - furnishing and landscaping <br />o Presentation of status by Bryon Weber <br />■ Next iteration in packet (80% plan); slight changes to pathway <br />and adventure play <br />■ Grading and drainage occurring now <br />■ GC and contractor providing preliminary cost projections <br />■ Budget is a bit high for both parks combined <br />■ Value engineering exercise is next - initial component is that <br />community area is central focus and play features are also <br />desired but may need to do some changes to features and <br />materials, inspecting pathway <br />• Talking about flipping seating area with the plaza looking <br />at where current trees are located so we may lose a tree <br />o Existing tree impacted by walkway intersection <br />o Three existing trees at the north; will try to keep <br />o Public Questions/Comments: <br />■ Would dense plants behind the plaza move? <br />• Yes, landscaping with plaza would move. <br />■ Can we retain the view? <br />• View is where the current bench is in park, looks over <br />houses to South <br />■ Concrete path from Washington and Arapahoe and Sunflower? <br />• Yes to Washington and Sunflower; concrete pathway <br />would be ADA accessible <br />• Crushed path to Sunflower <br />■ Other public comments: <br />6 <br />