Laserfiche WebLink
Law Department Approved Tracking #10 -41576 <br />(e.q., consulting with the Underground Services Association) to determine the <br />existence or location of pipelines and other subsurface structures prior to drilling <br />or excavating with mechanized equipment. Upon Licensee's written request, <br />which shall be made thirty (30) business days in advance of Licensee's <br />requested construction of the PIPELINE, Licensor will provide Licensee any <br />information that Licensor has in the possession of its Engineering Department <br />concerning the existence and approximate location of Licensor's underground <br />utilities and pipelines at or near the vicinity of the proposed PIPELINE. Prior to <br />conducting any such boring work, the Licensee will review all such material. <br />Licensor does not warrant the accuracy or completeness of information relating <br />to subsurface conditions and Licensee's operations will be subject at all times to <br />the liability provisions herein. <br />(b) For all bores greater than 26 -inch diameter and at a depth Tess than 10.0 feet <br />below bottom of rail, a soil investigation will need to be performed by the <br />Licensee and reviewed by Licensor prior to construction. This study is to <br />determine if granular material is present, and to prevent subsidence during the <br />installation process. If the investigation determines in Licensor's reasonable <br />opinion that granular material is present, Licensor may select a new location for <br />Licensee's use, or may require Licensee to furnish for Licensor's review and <br />approval, in its sole discretion a remedial plan to deal with the granular material. <br />Once Licensor has approved any such remedial plan in writing, Licensee shall, at <br />its sole cost and expense, carry out the approved plan in accordance with all <br />terms thereof and hereof. <br />16. Any open hole, boring or well constructed on the Premises by Licensee shall be safely <br />covered and secured at all times when Licensee is not working in the actual vicinity <br />thereof. Following completion of that portion of the work, all holes or borings constructed <br />on the Premises by Licensee shall be: <br />(a) filled in to surrounding ground level with compacted bentonite grout; or <br />(b) otherwise secured or retired in accordance with any applicable Legal <br />Requirement. No excavated materials may remain on Licensor's property for <br />more than ten (10) days, but must be properly disposed of by Licensee in <br />accordance with applicable Legal Requirements. <br />17. Upon termination of this License, Licensee shall, at its sole cost and expense: <br />(a) remove the PIPELINE and all appurtenances thereto, or, at the sole discretion of <br />the Licensor, fill and cap or otherwise appropriately decommission the PIPELINE <br />with a method satisfactory to Licensor; <br />(b) report and restore any damage to the Premises arising from, growing out of, or <br />connected with Licensee's use of the Premises; <br />(c) remedy any unsafe conditions on the Premises created or aggravated by <br />Licensee; and <br />(d) leave the Premises in the condition which existed as of the Effective Date of this <br />License. <br />-5 - <br />Form 424; Rev. 04/26/05 <br />