My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board of Adjustment Documents 1976
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
BOARD OF ADJUSTMENT
>
1974-1998 Board of Adjustment Agendas and Packets
>
1976 Board of Adjustment Agendas and Packets
>
Board of Adjustment Documents 1976
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2024 2:52:29 PM
Creation date
11/2/2006 9:12:11 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
BOADOCS 1976
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Show annotations
View images
View plain text
<br />Page 3. <br /> <br />Board member Ernest Marinelli asked Mr. Colabello the scheduled <br />time of completion. <br /> <br />Mr. Colabello stated that the completion of the project would <br />take thirty days, weather permitting. <br /> <br />Board member Don Pickett inquired as to the size of the exist- <br />ing building. <br /> <br />Mr. Colabello stated that the existing building on the lot is <br />26' X 19' in dimension. <br /> <br />Board member Bob Davies asked Mr. Stephan's oplnlon on his <br />suggestion that the structure be set farther south for fire <br />safety purposes. <br /> <br />Mr. Stephan stated that the reason for placing the structure <br />to the north was to obtain as close to ten feet between the <br />buildings as possible. <br /> <br />Board member Ernest Marinelli suggested that should the <br />variance be granted a time limit be stipulated. Mr. Marinelli <br />suggested that perhaps a six month time limit be stipulated. <br /> <br />Mr. Stephan explained to the Board that a City building permit <br />is good for as long as the construction work is continuous. <br />Mr. Stephan felt that a six month time stipulation would be <br />very liberal. <br /> <br />Board member Bob Davies expressed his concern that granting <br />Mr. Colabello's variance would set a precedent for future <br />applicants seeking a like variance, Mr. Davies wondered_.if <br />this would not be a snag in the Zoning Ordinance. <br /> <br />Mr. Stephan commented that the new ordinance speci~ies in a <br />provision that an auxilary building can be built within two <br />feet of a party-line. He added that the new ordinance has <br />provision that states the buildings must be ten feet apart. <br /> <br />Mr. Marinelli felt that the Board of Adjustment members must <br />take each applicant individually as there might be irregularities <br />and conditions that would merit a variance. <br /> <br />Mr. Davies concurred with Mr. Marinelli but added that he felt <br />e had to express his concern. <br /> <br />Ernest Marinelli moved that the Board of Adjustment amend the <br />variance to stipulate a time limit of six months for completion <br />of the project. The motion was seconded by Bob Davies. <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).