My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Minutes 2006 08 01
PORTAL
>
CITY COUNCIL RECORDS
>
MINUTES (45.090)
>
2006 City Council Minutes
>
City Council Minutes 2006 08 01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 2:41:47 PM
Creation date
1/31/2007 1:46:44 PM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Minutes
Signed Date
8/1/2006
Original Hardcopy Storage
7B6
Supplemental fields
Test
CCMIN 2006 08 01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> City Council <br /> Meeting Minutes <br /> August 1, 2006 <br /> Page 10 of 12 <br />. Installation of new AV/computer equipment in City Council chambers; <br />. Relocation of computer and telephone cabinets; <br />. Updated computer wiring throughout building; <br />. Updated paint and carpet throughout building; <br />. Energy conservation items such as new lighting, new window glazing; <br />The contractor's price estimate for the City Hall construction for these items was <br />approximately $1.5 million, which is the total budget for the entire project. The <br />scaled back project includes the following major items, and costs: <br />. New energy-efficient roof-top units for HVAC, using existing duct work and <br /> diffusers ($168,800); <br />. Roof replacement with additional R factor ($70,000); <br />. Renovation of old PD area ($100,000); <br />. Relocation of computer and phone room; <br />. Updated wiring throughout building ($90,000); <br />. New AV equipment and computer access in Council Chambers ($90,000); <br />. New transaction counters on first floor, update rest rooms ($100,000); <br />. New carpet and paint in lobby areas, Council Chambers and renovated <br /> office areas ($100,000); <br />. Stair modifications to meet building safety codes ($50,000); <br />. Energy-efficient lighting throughout building ($55,000). <br />Based on those changes, a new Guaranteed Maximum Price was submitted by <br />Pinkard Construction Company in the amount of $909,311. This price does not <br />include costs for bonds for labor and materials as required by the City of <br />Louisville due to an oversight in our original RFP and CM/GC contract <br />(approximately an additional 3%). In addition, the original amount included for <br />contractor's project fees was 5%, based on the anticipated construction amount <br />of $1.5 million. With the decreased project construction amount to approximately <br />$1 million, this percentage fee has been increased to 9.25%, changing from an <br />estimated $75,000 to a new amount of $76,900. The project general conditions <br />amount has decreased by approximately $46,000 due to the shortened <br />construction schedule (six months to four months). The preliminary project <br />budget prepared by staff totals $1,398,000 and includes approximate amounts <br />for the following items not included in the construction contract: <br />. Professional services - $142,000; <br />. Security systems - $65,000; <br />. Accessories - $32,500; <br />. AV Equipment for Council Chambers - $90,000; <br />. Computer wiring/utilities charges - $90,000; <br />. Additional project contingency - $45,000. <br />
The URL can be used to link to this page
Your browser does not support the video tag.