Laserfiche WebLink
PAINTED TUBE STEEL FRAME <br />STEEL BAR STOCK FRAME <br />STEEL PAN <br />SAMPLE TEXT —` <br />STONE CAP L1- <br />MASONRY BASE . I <br />4'4!• _ 8" <br />//-- RECESSED LIGHT NG SOURCE <br />7-- "— <br />XENON L.V STRIP WITHIN FRAME , <br />THE MOFFITT <br />BUILDING <br />LOFTS <br />R <br />SA° <br />H <br />H <br />NI <br />?ta <br />NORTH AND SOUTH ELEVATION EAST & WEST ELEVATION <br />OSIGNAGE MONUMENT <br />1 /211=1-0" <br />S 2 ONA.FLOOR T.O PLVWOOS <br />FIRSTU°FLOOFK_T G SLAB .... <br />100'- <br />MAIN STREET <br />EXISTING CONCRETE SIDEWALK <br />EXISTING STREET CURB & GUTTER - -- <br />SECTION-1 <br />1 /2"=1'-0'1 <br />T. <br />O..DECKING. <br />122'0• <br />N <br />PROPERTY LINE <br />MASONRY PLANTER <br />- PATTERNED CONCRETE RAMP <br />UP 12" <br />STEEL HANDRAIL <br />PATTERNED CONCRETE <br />(SLOPE 1/8" PER FOOT AWAY FROM BUILDING) <br />MASONRY PLANTER <br />MONUMENT SIGN <br />IN FRONT, SEE DETAIL ABOVE <br />SOUTH BUILDING BEYOND — <br />ORNAMENTAL STEEL CORNICE <br />COLOR D <br />ORNAMENTAL STEEL HEADER <br />COLOR D <br />ALUMINUM CLAD WOOD SASH WINDOW <br />HORIZONTAL SIDING PAINT <br />COLOR C <br />BRICK or MASONRY VENEER <br />GLASS AND STEEL TRELLIS <br />ALUMINUM/ GLASS STOREFRONT <br />STEEL HANDRAIL <br />PATTERNED CONCRETE STEPS <br />UP 12" <br />21'E° <br />Residential Unit-3 <br />NORTH BUILDING <br />Commercial Tennant <br />CORNCE <br />12a'-10" <br />TO PAR124'LAPET <br />" <br />TO DECNG <br />12KI2'-0" <br />SEOONO FLOOR T O. PLYWOOD . <br />FIRST FLOOR T O SLAB 4. <br />ARC <br />Boulder, O60sp0r8S <br />[PI 303 546 6868 <br />(R 303 443 3910 <br />www.archll com <br />O THESE DRAWINGS AND <br />TREPRESEHE DESIGNTREY <br />THE PROPERTY INC. <br />ARCH 1T IC <br />AND AREINTENDEDCONSTRUCTION <br />USEDAT THE <br />STATED <br />TED LOOCTON <br />ATTHE STATED <br />ANY UNAUTHORIZED <br />REPRODUCTION OR <br />OTHER USE OF TH <br />DRAWINGSOR DESIGN <br />1s STRICTLY PROHIBITED <br />Date: 07.08.03 <br />Drawn By. JT. EJM <br />Checked By <br />Reoslon Dale By <br />6 <br />6 <br />A <br />❑ Site Survey <br />❑ Predawn <br />Schematic Design <br />❑ Pncng Package <br />❑ Development <br />❑ BM Document <br />❑ o°Ln",:ecfion <br />❑ n <br />-1`;%°menml <br />Iormahon <br />SECTION <br />p..4) F.,705 3 ( P'043) A3.02 <br />